Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0423-01045
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/17/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/17/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical comments and provide a written response. The Office PV system mounted on the Industrial Building roof must be grounded to the Industrial Buildings Grounding Electrode system per NEC art 690..47. Verify the amount of PV Modules installed on the roof of the Industrial building that are assigned to the Office Building. Plan sheet A-01 and A-02 show 256 PV Modules and the actual roof count shown in maroon font is 260. Please clarify. All Electrical and Architectual plan sheets must be sealed by a Registrant registered in the State of Arizona including the Site Plan. The LASER PV system mounted on the OFFICE Building roof must be grounded to the OFFICE Buildings Grounding Electrode system as well as the LASER Buildings GEC system per NEC art 690.47. Provide a readily accessible Auxiliary Rapid Shutdown device and Warning label at this buildings electrical service location to provide Rapid Shutdown of the Laser Array installed on this buildings rooftop. This is to ensure safety for First Responders. NEC 690.12(C). Ref; 2018 IBC section 107.1, 107.2.1, 2017 NEC. |
||
| 07/14/2023 | Commercial Building | REVIEW COMPLETED | |||
| 06/12/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |