Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0423-01020
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/14/2023 | External Reviewers - SAFEBuilt | APPROVED | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 7/14/2023 3:32:39 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 7/6/2023 12:26:27 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Conditionally Approved Reason: Date Completed : 7/5/2023 4:08:30 PM Electrical Review of UPS By: Ron Ross PE Correct issues if required by code. Approved with the following comments E101: Comment only: Should re-evaluate panel LMDP2 and upsize fuses and conductors if needed. E800: LMDPP is shown as 800 amp feeder, but one line on Sheet E101 has feeder sized at 400 amps. E801: LMDPP is shown as 800 amp feeder, but one line on Sheet E101 has feeder sized at 400 amps. Also the panel calculations imply that fuse and conductors may experience an overload. Re-balance loads or upsize feeder and conductor if required. E802: LMDPP is shown as 800 amp feeder, but one line on Sheet E101 has feeder sized at 400 amps. |
||
06/29/2023 | Site Zoning | APPROVED | |||
07/06/2023 | Site Engineering | NOT REQUIRED | |||
07/17/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
07/12/2023 | Fire New Construction | REVIEW COMPLETED | Separate permits required for modifications/additions to: * fire sprinkler * fire alarm |
||