Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0423-00982
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2023 | Site Engineering | NOT REQUIRED | |||
05/09/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/05/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0423-00982 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. Provide Structural Calculations for Foundations, Columns, Floor Framing and Roof Framing per Section 1601.1 of International Building Code 2018. The Structural Calculations provided are inadequate. 2. Provide Wind Load Calculations for the Building per Section 1609 of International Building Code 2018. 3. Provide Seismic Calculations for the Building per Section 1613 of International Building Code 2018. 4. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. 5. Provide Geotechnical Report for the proposed building per International Building Code 2018, Section 1803.1. 6. Provide schedule of special inspections as required in IBC Section 1705. 7. Structural steel, components and fasteners that are exposed are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 8. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Provide galvanized bolts on the framing connections that are galvanized. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Denied 1. Sheet AI0.3: The west stair has a storage space that is accessible from the interior of the stair shaft. Provide an alternative entrance to the storage area in accordance with Section 1023.4. 2. Sheet AI0.3: Provide additional drawings or details that clearly show the complete exit travel path from the second floor to exit discharge. It currently shows an exit exiting to an exterior exit balcony which travels to an exterior stair. Provide additional information regarding the exiting capacity of this existing stair based on our previous meeting. 3. Sheet AI2.0: The west stair is required to have a fire resistance rating of 1 hour. However, the wall types provided for the shaft are not indicated as having a rating. Provide the listed assemblies chosen for these rating along with all necessary listing drawings and details. 4. Sheet AI2.0: The doors on the west stair are not rated properly. Provide properly rated doors in accordance with Table 716.1(2). 5. Sheet AI2.1: The west stair is required to have a fire resistance rating of 1 hour. However, the wall types provided for the shaft are not indicated as having a rating. Provide the listed assemblies chosen for these rating along with all necessary listing drawings and details. 6. Sheet AI2.1: The doors on the west stair are not rated properly. Provide properly rated doors in accordance with Table 716.1(2). 7. General: Provide all additional narratives and drawings as discussed in the meeting held on 4/14/23. MECHANICAL REVIEW COMMENTS: Conditinally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Denied E0.1 LIGHT FIXTURE SCHEDULE, CALCULATION, AND CONTROLS: Recalculate Outdoor Lighting Code compliance or explain why calculations are 179% of the allowable used ie 79% more than what is allowed. E2.0 POWER PLAN - 1ST FLOOR: Confirm Exam rooms do not need to meet NEC 517 requirements related to receptacle grounding. Comment applies to all exam type rooms where applicable. How do you determine which HW unit is which. Cannot seem to identify units or circuits on power plans or Mechanical power plans. E3.2 MECHANICAL SCHEDULES: Comment only, some duplication of mechanical equipment in electrical schedules such as WH 5-7. Could not locate any identification for WH units in either power or mechanical power plans. E5.0 ONE LINE DIAGRAM, SES AND FEEDER SCHEDULE: 200amp Panel 1LD2 is undersized for the transformer. Feeder schedule indicates that xfmr 1T2 may be a 75 KVA. Correct or clarify. E5.3 PANEL SCHEDULES: Panel 1LD2 total estimated demand current exceeds panel size. Suggest to recalculate demand current based upon NEC methods and then upsize if necessary. Only need to calculate this panel as all other panels have connected loads below panel sizes rendering calculations a moot point for other panels. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review 1). Grease System Bldg drain needs one vent to exterior open air on plan page P1.3 detail F, currently only shows 3 AAVs. - IPC 904.1 2). Plan Page P5.0 shows the existing grease interceptor is a hydromechanical type, Per Tucson amendments a hydromechanical type can't be used for a dishwasher & or more than 4 items. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
05/02/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: Paul Camarena PDSD Zoning Review Section PROJECT: TC-COM-0423-00982 782 E TUCSON MARKETPLACE BL Zoning PAD-15 TRANSMITTAL DATE:May 2, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 1.COMMENT: Zoning is unable to approve the Tenant Improvement until the shell permit is reviewed and approved TC-COM-0223-00714. If you have any questions about this transmittal, Contact Paul Camarena at (520)837-4986 or by email Paul.Camarena@tucsonaz.gov |
||
05/09/2023 | Fire New Construction | REVIEW COMPLETED | |||
04/10/2023 | PDSD Application Completeness | REVIEW COMPLETED |