Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0326-00366
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/26/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 06/25/2026 | Site Zoning Standard | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Commercial Building Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Electrical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Mechanical Standard | PENDING ASSIGNMENT | |||
| N/A | Commercial Plumbing Standard | PENDING ASSIGNMENT | |||
| N/A | Outdoor Lighting Standard | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 06/24/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | Page D1.0 (NW corner) calls for demo in CMU wall for door. Page P1.2 shows riser in that location with FDC, main drain and flow alarm where demo'd door will be. Currently, there is no FDC thru wall at this location. Please change all drawings to reflect final decision on riser / sprinkler system. Separate permits required for installation/ modification of fire sprinklers/ riser. | ||
| 06/22/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |