Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0326-00366
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/13/2026 | Commercial Building Standard | APPROVED | |||
| 07/10/2026 | Commercial Electrical Standard | APPROVED | Approved with comments added to plans: GFCI protection per NEC 210.8(B)(1). |
||
| 07/14/2026 | Commercial Mechanical Standard | APPROVED | |||
| 07/14/2026 | Commercial Plumbing Standard | APPROVED | |||
| 07/14/2026 | Water - PDSD Standard | APPROVED | |||
| 07/10/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 06/26/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 06/25/2026 | Site Zoning Standard | NOT REQUIRED | |||
| 07/14/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/24/2026 | Fire New Construction Standard | REQUIRES RESUBMIT | Page D1.0 (NW corner) calls for demo in CMU wall for door. Page P1.2 shows riser in that location with FDC, main drain and flow alarm where demo'd door will be. Currently, there is no FDC thru wall at this location. Please change all drawings to reflect final decision on riser / sprinkler system. Separate permits required for installation/ modification of fire sprinklers/ riser. | ||
| 06/22/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |