Permit Number: TC-COM-0326-00365
Parcel: 10510088Q

Address:
800 E WETMORE RD

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0326-00365
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/01/2026 Commercial Building Standard APPROVED
03/26/2026 Outdoor Lighting Standard APPROVED
04/06/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/27/2026 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0326-00365 (800 E WETMORE RD TUCSON, AZ 85719)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC).

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov

1. Reference sheet PV 2.3, Keynotes #8. This interconnection does not meet the requirements of NEC 705.12(B)(2). Update interconnection method and show compliance with the appropriate method used.
04/02/2026 Site Engineering Standard REQUIRES RESUBMIT Permit: TC-COM-0326-00365 – Commercial Solar Permit
Location: 800 E WETMORE RD
Review Date: 4/2/2026

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.

Drainage Manual Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage…

Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete…

Overall, for application submittal requirements, see Administrative Manual Section 2-06

Site Engineering:

1. Site Engineering has reviewed the plans for compliance with development package TD-DEV-0226-00030. Until the development package is approved by all reviewers, site engineering will be unable to approve permit TC-COM-0326-00365.

If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov
04/03/2026 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM:
Bobby Parsons
Zoning Section Review

PROJECT:
TC-COM-0326-00365 - TD-DEV-0226-00030
800 E. Wetmore Rd. Tucson, AZ 85719
Wetmore Tucson LLC PV System (1st Review)

TRANSMITTAL DATE: 4/3/2026

The site is located in C-2 zone (UDC 4.7.21).

Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed.

1. Comment: Site Zoning has reviewed the building plans for compliance with the associated Development Package (DP) TD-DEV-0226-00030. While it appears the building plans match the DP, Site zoning cannot approve this permit until the DP is approved by all review agencies.
2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted.

If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov.
04/06/2026 Fire New Construction Standard REVIEW COMPLETED
03/13/2026 PDSD Application Completeness Express REVIEW COMPLETED