Permit: TC-COM-0326-00365
Permit Details
Apply Date:
03/13/2026
Applicant:
Kelly Rehm
Description:
The WETMORE TUCSON LLC photovoltaic system will consist of 366 JA Solar 595W modules & 4 grid-tied inverters. The system will supply power through an existing TEP service. Two TEP service will be combined as part of this permit. Modules will be both roof-mounted using racking and on a new steel parking canopy in an existing paved parking area.
Permit Reviews
Permit Number - TC-COM-0326-00365
Permit Status: In review
Permit Description: The WETMORE TUCSON LLC photovoltaic system will consist of 366 JA Solar 595W modules & 4 grid-tied inverters. The system will supply power through an existing TEP service. Two TEP service will be combined as part of this permit. Modules will be both roof-mounted using racking and on a new steel parking canopy in an existing paved parking area.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/08/2026 | COMMERCIAL REVIEW - FULL v.2 | N/A | IN REVIEW |
| 03/13/2026 | COMMERCIAL REVIEW - FULL v.1 | 04/07/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0326-00365
Permit Status: In review
Permit Description: The WETMORE TUCSON LLC photovoltaic system will consist of 366 JA Solar 595W modules & 4 grid-tied inverters. The system will supply power through an existing TEP service. Two TEP service will be combined as part of this permit. Modules will be both roof-mounted using racking and on a new steel parking canopy in an existing paved parking area.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/13/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 04/01/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/01/2026 | SPECIAL INSPECTION OF FABRICATORS IS REQUIRED. (SUBMIT FABRICATOR'S CERTIFICATE OF COMPLIANCE OR SPECIAL INSPECTION REPORT TO RESOLVE) |
| 04/01/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 04/01/2026 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |