Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0326-00353
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/02/2026 | Commercial Mechanical Standard | APPROVED | |||
| 04/02/2026 | Commercial Plumbing Standard | APPROVED | |||
| 03/31/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 04/02/2026 | Water - PDSD Standard | NOT REQUIRED | |||
| 04/07/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/02/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Ed Kulik ekulik@willdan.com 480.241.0634 Sheet a1.21 There will be Ceiling Grid that will need repairs or replacement. Provide Ceiling Grid details. |
||
| 04/02/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Sheet ed2.0 Provide details for the drop in light fixture. (EK) | ||
| 04/03/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit: TC-COM-0326-00353 – Commercial Addition/Alteration Location: 9538 E OLD VAIL RD Review Date: 4/3/2026 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-06 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage… Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-rete… Overall, for application submittal requirements, see Administrative Manual Section 2-06 Site Engineering: 1. In compliance with General Note #9 from the final plat for Rita Ranch Commerce Center, a floodplain use permit will be required to be submitted and approved prior to Site Engineering approving permit TC-COM-0326-00353. The FPU permit is a separate permit that can be submitted for within the “sub-records” tab of this development package permit on TDC online. For the FPU permit submission, provide all construction documents similar to what was provided within this permit submission. 2. The proposed alterations shown for parking spaces and new exterior gate will require that a Development Plan be submitted and approved prior to Site Engineering approving permit TC-COM-0326-00353. The DP permit is a separate permit that can be submitted for within the “sub-records” tab of this development package permit on TDC online. For the DP permit submission, provide all construction documents similar to what was provided within this permit submission. If you have any questions or concerns, please contact Joe Macaulay at: Joe.Macaulay@tucsonaz.gov |
||
| 04/06/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-0326-00353 9538 E. Old Vail Rd. Bldg. 1 Tucson, AZ 85747 Interior TI and New Exterior Gate (1st Review) TRANSMITTAL DATE: 4/6/2026 This site is located in the I-2 zone (UDC 4.7.30). Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: As the new proposed exterior gate alters the existing parking lot layout, a Development Package (DP) will be required. Per UDC Article 3.3.3.G.2.c, a site plan (DP) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A DP meeting the minimum requirements is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/submittal_requirements.pdf. Site zoning is unable to approve this building permit until the DP has been approved by all reviewers. 2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 04/07/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 03/16/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |