Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0325-00586
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/18/2025 | Site Zoning Standard | APPROVED | |||
| 04/03/2025 | Outdoor Lighting Standard | NOT REQUIRED | No Changes to outdoor lighting. | ||
| 04/18/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 04/21/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/21/2025 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0325-00586 ADDRESS/PARCEL: (2475 N SWAN RD TUCSON, AZ 85712) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: 1. Sheet C1 – Code Analysis a. Add the calculation for Minimum Number of Required Plumbing Fixtures per IBC Table 290.1 2. Sheet A1 – Floor Plan a. The City understand that you are keeping the existing panic hardware. However, you are proposing additional new doors. b. Please install new panic hardware on door 3 and 4. c. Please install new panic hardware on doors at the back vestibule(s). d. Please install new panic hardware on door where required complying to IBC 1010.1.10. 3. Sheet A1 - MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES a. Drinking Fountain is missing. Provide per IBC Table 290.1 and drinking fountain shall be accessible per ICC A117.1 section 602 with required clear floor space and knee/toe clearance per section 306, 36 inches spout outlet height (30 inches for children), 38 inches minimum / 43 inches maximum for person standing (30 inches minimum / 43 inches maximum for children). b. Service Sink is missing. Locate and clearly label the service sink location per IBC TABLE 2902.1 MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES 4. Sheet A1 – Accessible Shower(s) a. Install Grab bars ICC ANSI A117.1 section 604.5, toilet and bathing facilities, grab bars and shower seat reinforcement sec 1104.11 ICC A117.1 5. Sheet A1 – 7 ft deep well, 3 ft deep well a. Are these wells requiring slab to be cut and removed? b. Please provide structural detail drawings. 6. Install sign: This Door To Remain Unlocked When This Space Is Occupied. IBC 1010.1.9.4 7. Please resubmit. Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
| 04/04/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0325-00586 (2475 N SWAN RD TUCSON, AZ 85712) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Provide a complete electrical plan-set showing all proposed electrical work. 2. Should include but not be limited to: a. Provide electrical load calculations and rating, for the Main Service Panel, Per NEC 220.40. b. Provide a panel schedule highlighting the circuits that are being modified and added. Correlate the panel schedule circuit numbers with the location of the electrical outlets, receptacles, switches, mechanical equipment, etc, on the electrical plan. c. Show all wiring methods in detail for all branch circuit wiring along with branch circuit and breaker panel designations and correlate with the panel schedules. NEC arts;300 and 408.4. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 04/21/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Clarify which duct work is new and which is existing. Reference: Section 107.2.1, IBC 2018. 2. Provide exhaust for the new shower rooms. Reference: Section 403.3.1.1, IMC 2018. 3. Provide balancing information, sequence of operation, installation details, and equipment specifications for the exhaust fans in the new restrooms and the shower rooms. Reference: Section 301.7, 304.1, and 403.3.1.5, IMC 2018. 4. Show that the new duct work is equipped with adequate volume dampers or other devices needed to regulate the air flow to each register or grille. Reference: Section 403.3.1.5 and 603.18, IMC 2018. 5. Clarify how return air from the new offices is being accomplished. Reference: Section 601.2, IMC 2018. |
||
| 04/21/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Provide third-party listing and material standards for all plumbing fixtures. Reference: Sections 303.4 and 402, IPC 2018. 2. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 3. Provide tempered water for the restroom lavatories using approved devices conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. 4. Provide details to show that the construction of the shower room floor complies with the requirements of Section 421.5, IPC 2018. 5. Provide sufficient information to show that the installation of the new plumbing fixtures will not cause the existing water supply and sanitary waste to become overloaded. 6. Section 604.1, IPC 2018 allows water distribution systems to be designed using accepted engineering methods. Provide the source of the method used to determine the water demand and size the water distribution system. 7. Verify that the pipe sizes called out for the flush valves will not result in water velocities greater than that recommended by the pipe manufacturer (e.g. limit the water velocity to less than 8 FPS for copper, PEX, or CPVC piping). At a minimum design flow rate of 25 GPM for a siphonic, flush-valve water closet, a 1” Type L copper pipe has a flow velocity of 9.7 FPS. Reference: Table 604.3, IPC 2018. 8. The developed length of the hot water supply piping appears to be greater than fifty feet; provide a method for maintaining the temperature of the hot water supply system. Reference: Section 607.2, IPC 2018 and C404.5, IECC 2018. 9. Verify that the distance from the hot water source to the hot water termination for the new public lavatories complies with the requirements of Section C404.5, IECC 2018. 10. Show that each trap and trapped fixture (e.g., the new restroom lavatories) has been vented in accordance with one of the methods shown in the IPC. Reference: Section 901.2.1, IPC 2018. |
||
| 04/21/2025 | Fire New Construction Standard | REQUIRES RESUBMIT | -Make corrections to the applicable codes, sheet C1. We have adopted the 2024 IFC. -Include occupant load of each individual room, specifically the dance studio. -Include an exiting diagram that includes OL, travel distances, etc... -Gymnastics studio will be considered an A3 and not a B. -Determine new OL based on assembly factor. New OL will determine if a fire alarm is required. -Assembly type occupancies require panic hardware per IFC 1010.2.8. Review your exiting hardware to comply with this section. john.vincent@tucsonaz.gov 5203495581 |
||
| 04/21/2025 | Water - PDSD Standard | REQUIRES RESUBMIT | Provide the size and serial number of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. | ||
| 03/27/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |