Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2475 N SWAN RD
Address NEW:
2475 N SWAN RD
Apply Date:
03/21/2025
Applicant:
MARK WRIGHT
Description:
TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT

Permit Reviews

Permit Number - TC-COM-0325-00586
Permit Status: Complete
Permit Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Start Date Submittal Complete Date Status  
08/07/2025 COMMERCIAL REVIEW - FULL v.3 08/11/2025 APPROVED Review Details
07/11/2025 COMMERCIAL REVIEW - FULL v.2 08/04/2025 REQUIRES RESUBMIT Review Details
08/11/2025 RESTAMP - COMMERCIAL v.1 08/14/2025 APPROVED Review Details
06/23/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/25/2026 APPROVED Review Details
06/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2026 APPROVED Review Details
03/27/2025 COMMERCIAL REVIEW - FULL v.1 04/21/2025 REQUIRES RESUBMIT Review Details
10/15/2025 COMMERCIAL REVIEW - FULL REVISION v.1 11/10/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0325-00586
Permit Status: Complete
Permit Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Date Description Comments
07/31/2025 AIR BALANCING REPORT IS REQUIRED.
03/27/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/27/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/21/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00586
Permite Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
08/28/2025 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready no access for inspection
09/25/2025 COT - LCEL - Electrical Intermediate N/A Partial Pass Walls
12/19/2025 COT - LCEL - Electrical Above Ceiling N/A Not Applicable
12/19/2025 BULD - Electrical Clearance N/A Not Applicable
03/19/2026 COT - LCME - Mechanical Final N/A Canceled Work incomplete and not matching approved plans.
03/19/2026 COT - LCPL - Plumbing Final N/A Canceled Work incomplete and not matching approved plans.
03/19/2026 COT - LCEL - Electrical Final N/A Canceled Work incomplete and not matching approved plans.
05/19/2026 ENGR Engineering Final N/A Not Ready Work inside building is not yet complete. Address numbers are up, but site parking is being repaved. Reschedule when work is finished.
COT - FCON - Sprinkler - Final N/A Not Ready
03/19/2026 COT - LCBU - Building Final N/A Canceled Work incomplete and not matching approved plans.
COT - FCON - Fire - Final N/A Not Ready Alarm notification is required throughout building due to its A-3 occupancy and occupant load of 450 people.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0325-00586
Permit Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Total Completed Inspections - 16
Date Description Inspector Results Comments
09/08/2025 COT - LCPL - Rough Soil Passed Both new women's and men's restrooms south end approved. Okay to backfill progress areas. Shading material is required. 9/8/2025
10/01/2025 COT - LCBU - Excavation/Rebar/Zoning Passed Rebar and forms for landing pits are in place. Ok to place concrete for side walls at 3,000 psi.
10/02/2025 COT - LCPL - Plumbing Intermediate Passed
10/06/2025 COT - LCEL - Electrical Intermediate Passed
11/13/2025 COT - LCBU - Framing Passed
11/26/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 11/26/2025
12/19/2025 COT - LCME - Mechanical Intermediate Passed
12/19/2025 COT - LCEL - Outdoor Lighting Passed all work per approved plans
05/27/2026 COT - LCME - Mechanical Final Passed
05/27/2026 COT - LCPL - Plumbing Final Passed
05/27/2026 COT - LCEL - Electrical Final Passed
05/27/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
06/12/2026 COT - FCON - Sprinkler - Final Passed Approved on TF-FCP-1025-00896 on 6/11/2026.
06/12/2026 COT - FCON - Alarm - Final Passed
06/15/2026 COT - LCBU - Building Final Passed 6.15.26
Submit water sterilization report and air balancing for CofO.
06/26/2026 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
TUCSONGYMNASTICSACADEMY_V1.PDF DOCUMENTS VIEW
FINAL REPORT NC2606-022 RANEL COX-2026-06-16_V1.PDF DOCUMENTS VIEW
CONS-SUB1_REV1_PLAN SET_TUCSON GYMNASTICS ACADEMY - TI_V1.PDF DOCUMENTS VIEW
SUB1_REV1_REVISION NARRATIVE_TUCSON GYMNASTICS ACADEMY - TI_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-SUB3_PLAN SET_TUCSON GYMNASTICS ACADEMY - TI_V3.PDF DOCUMENTS VIEW