| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/07/2025 | COMMERCIAL REVIEW - FULL v.3 | 08/11/2025 | APPROVED |
| 07/11/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/04/2025 | REQUIRES RESUBMIT |
| 08/11/2025 | RESTAMP - COMMERCIAL v.1 | 08/14/2025 | APPROVED |
| 06/23/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/25/2026 | APPROVED |
| 06/18/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2026 | APPROVED |
| 03/27/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/21/2025 | REQUIRES RESUBMIT |
| 10/15/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 11/10/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0325-00586
Permit Status: Complete
Permit Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
| Date | Description | Comments |
|---|---|---|
| 07/31/2025 | AIR BALANCING REPORT IS REQUIRED. | |
| 03/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 03/27/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/21/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00586
Permite Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/28/2025 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Not Ready | no access for inspection |
| 09/25/2025 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | Walls |
| 12/19/2025 | COT - LCEL - Electrical Above Ceiling | N/A | Not Applicable | |
| 12/19/2025 | BULD - Electrical Clearance | N/A | Not Applicable | |
| 03/19/2026 | COT - LCME - Mechanical Final | N/A | Canceled | Work incomplete and not matching approved plans. |
| 03/19/2026 | COT - LCPL - Plumbing Final | N/A | Canceled | Work incomplete and not matching approved plans. |
| 03/19/2026 | COT - LCEL - Electrical Final | N/A | Canceled | Work incomplete and not matching approved plans. |
| 05/19/2026 | ENGR Engineering Final | N/A | Not Ready | Work inside building is not yet complete. Address numbers are up, but site parking is being repaved. Reschedule when work is finished. |
| COT - FCON - Sprinkler - Final | N/A | Not Ready | ||
| 03/19/2026 | COT - LCBU - Building Final | N/A | Canceled | Work incomplete and not matching approved plans. |
| COT - FCON - Fire - Final | N/A | Not Ready | Alarm notification is required throughout building due to its A-3 occupancy and occupant load of 450 people. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0325-00586
Permit Description: TUCSON GYMNASTICS ACADEMY - TENANT IMPROVEMENT
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2025 | COT - LCPL - Rough Soil | Passed | Both new women's and men's restrooms south end approved. Okay to backfill progress areas. Shading material is required. 9/8/2025 | |
| 10/01/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | Rebar and forms for landing pits are in place. Ok to place concrete for side walls at 3,000 psi. | |
| 10/02/2025 | COT - LCPL - Plumbing Intermediate | Passed | ||
| 10/06/2025 | COT - LCEL - Electrical Intermediate | Passed | ||
| 11/13/2025 | COT - LCBU - Framing | Passed | ||
| 11/26/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 11/26/2025 | |
| 12/19/2025 | COT - LCME - Mechanical Intermediate | Passed | ||
| 12/19/2025 | COT - LCEL - Outdoor Lighting | Passed | all work per approved plans | |
| 05/27/2026 | COT - LCME - Mechanical Final | Passed | ||
| 05/27/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 05/27/2026 | COT - LCEL - Electrical Final | Passed | ||
| 05/27/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 06/12/2026 | COT - FCON - Sprinkler - Final | Passed | Approved on TF-FCP-1025-00896 on 6/11/2026. | |
| 06/12/2026 | COT - FCON - Alarm - Final | Passed | ||
| 06/15/2026 | COT - LCBU - Building Final | Passed | 6.15.26 Submit water sterilization report and air balancing for CofO. |
|
| 06/26/2026 | COT - FCON - Fire - Final | Passed |