Permit Number: TC-COM-0325-00501
Parcel: 120052770

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0325-00501
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/29/2025 Commercial Building Standard APPROVED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 9/25/2025 9:06:46 AM


Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 9/23/2025 3:47:59 PM
10/07/2025 Site Engineering Standard APPROVED
10/16/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
09/29/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 9/24/2025 4:27:34 PM
1. (UNRESOLVED) - General - Provide Heat Load Calculations - 2018 IECC Section C403.1.1 Calculation of heating
and cooling loads.
i. Heat load Summary submitted for review shows 29 tons / Total coil load 347.7 MBH. It also shows Sensible
Coil Load 347.7 MBH. Is there no Latent Load?
▪ Design load on plan sheet M5.0 shows 751.4 MBH (659.6 Sensible 91.8 MBH Latent). Design is twice
the amount shown on Heat Load Calculations. Confirm Heat load calculations and design. - 2018 IECC -
C403.3.1 Equipment sizing (Mandatory). - 2018 IECC Section C103.2Information on construction
documents. - 2018 IBC Section [A]107.2.1Information on construction documents.
09/29/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 9/28/2025 8:16:16 PM
SECOND PLUMBING REVIEW: COMMENT 2 REMAINS
RESOLVED--1). General: Address building plan review comment 2. Bldg comment 2 could affect fixture count. -2018 IPC
403.1
UNRESOLVED-2). Plan Page A0.70: Incorrect fixture count & plumbing code listed. Fixture counts need to derive from -2018
IPC 403.1 which equate to 4 male & 4 female toilets and 3 Female lavatories & 3 male lavatories .
RESOLVED-3). Plan Page A0.10: Missing a complete sheet index. Update sheet index to correlate with all the plan sheets
provided-2018 IPC 106.3.1
RESOLVED-4). Plan page P4.0: Missing enlarged sanitary & water details that correlate to each floor level. Add enlarged
sanitary & water details that correlate to each floor level- 2018 IPC 106.3.1
RESOLVED-5). Plan Page P2.4: Missing GPM loads next to each set of Roof drains. Add GPM loads next to each set of
Roof drains. -2018 IPC 1106.2
RESOLVED-5). Plan Page P6.0 Water riser diagram: Missing riser continuation that illustrates all floor levels. Add riser
continuation that illustrates all floor levels. -2018 IPC 106.3.1
RESOLVED-6). Plan Page P6.1 Sanitary riser diagram: Missing riser continuation that illustrates all floor levels. Add riser
continuation that illustrates all floor levels. -2018 IPC 106.3.1
RESOLVED-7). Plan page P4.0: Missing correct fixture identifier for P5 service sink and missing water heater location. Add
correct fixture identifier for P5 service sink and show water heater location. -2018 IPC 106.3.1
10/16/2025 Site Zoning Standard REQUIRES RESUBMIT PDSD TRANSMITTAL

FROM: Krista Hansen
Planning & Development Services Department – Zoning Review Section

PROJECT: TC-COM-0325-00501 - TD-DEV-1224-00333
980 W IRVINGTON RD – C-1
Personal Storage (2nd Review)

TRANSMITTAL DATE: 10/16/2025


This site is located in the C-2 zone (UDC 4.7.21). Personal Storage is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.10.C.3 & .6.


01. COMMENT: Zoning has reviewed the building plans for compliance with Development Package (DP) TD-DEV-1224-00333 and although it appears that the building plans match the DP, until the DP is approved by all review agencies, Zoning cannot approve this building permit.


For questions regarding Zoning comments, please contact me at: Krista.Hansen@tucsonaz.gov
09/30/2025 Water - PDSD Standard REQUIRES RESUBMIT 1. Comment not addressed. [Initial comment: Provide a site plan showing the location of the water meter, reduced pressure backflow assembly and the route of the water service to the building. Specify the material of construction for the water service pipe. Reference: Section 107.2.1, IBC 2018.]
2. Comment not addressed. [Initial comment: Provide the size of the water meter serving the building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.]
09/22/2025 PDSD Application Completeness Express REVIEW COMPLETED