Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0325-00420
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/25/2025 | Water - PDSD Standard | APPROVED | |||
| 03/13/2025 | Commercial Mechanical Standard | NOT REQUIRED | |||
| 04/01/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 03/25/2025 | Site Zoning Standard | NOT REQUIRED | |||
| 04/01/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/13/2025 | Commercial Building Standard | REQUIRES RESUBMIT | March 6, 2025 1st Review Shive-HatteryArchitecture+Engineering Attn: Joel Mesik 4330 N. Campbell Avenue, Suite 268 Tucson, Arizona 85718 Re: JTED II PLUMBING MODIFICATIONS City of Tucson Permit Number: TC-COM-0325-00420 Stantec Project Number: 185215066 Stantec File Number: TUC-25-031 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms E II-B 51,748 815 Yes No Separate Permits: None. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet P1.0 1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604] 2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly. 3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify. ELECTRICAL COMMENTS Sheet E1-SK 1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 03/13/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | March 6, 2025 1st Review Shive-HatteryArchitecture+Engineering Attn: Joel Mesik 4330 N. Campbell Avenue, Suite 268 Tucson, Arizona 85718 Re: JTED II PLUMBING MODIFICATIONS City of Tucson Permit Number: TC-COM-0325-00420 Stantec Project Number: 185215066 Stantec File Number: TUC-25-031 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms E II-B 51,748 815 Yes No Separate Permits: None. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet P1.0 1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604] 2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly. 3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify. ELECTRICAL COMMENTS Sheet E1-SK 1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 03/13/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | March 6, 2025 1st Review Shive-HatteryArchitecture+Engineering Attn: Joel Mesik 4330 N. Campbell Avenue, Suite 268 Tucson, Arizona 85718 Re: JTED II PLUMBING MODIFICATIONS City of Tucson Permit Number: TC-COM-0325-00420 Stantec Project Number: 185215066 Stantec File Number: TUC-25-031 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms E II-B 51,748 815 Yes No Separate Permits: None. Deferred Submittals: None. Special Inspections: None. ARCHITECTURAL COMMENTS There are no comments. PLUMBING COMMENTS Sheet P1.0 1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604] 2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly. 3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify. ELECTRICAL COMMENTS Sheet E1-SK 1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify. Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
| 03/05/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 03/05/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |