Permit Number: TC-COM-0325-00420
Parcel: 13213104B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0325-00420
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/25/2025 Water - PDSD Standard APPROVED
03/13/2025 Commercial Mechanical Standard NOT REQUIRED
04/01/2025 Site Engineering Standard NOT REQUIRED
03/25/2025 Site Zoning Standard NOT REQUIRED
04/01/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/13/2025 Commercial Building Standard REQUIRES RESUBMIT March 6, 2025
1st Review

Shive-HatteryArchitecture+Engineering
Attn: Joel Mesik
4330 N. Campbell Avenue, Suite 268
Tucson, Arizona 85718

Re: JTED II
PLUMBING MODIFICATIONS

City of Tucson Permit Number: TC-COM-0325-00420
Stantec Project Number: 185215066
Stantec File Number: TUC-25-031

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
E II-B 51,748 815 Yes No
Separate Permits: None.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

There are no comments.

PLUMBING COMMENTS

Sheet P1.0

1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604]

2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly.

3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify.

ELECTRICAL COMMENTS

Sheet E1-SK

1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
03/13/2025 Commercial Electrical Standard REQUIRES RESUBMIT March 6, 2025
1st Review

Shive-HatteryArchitecture+Engineering
Attn: Joel Mesik
4330 N. Campbell Avenue, Suite 268
Tucson, Arizona 85718

Re: JTED II
PLUMBING MODIFICATIONS

City of Tucson Permit Number: TC-COM-0325-00420
Stantec Project Number: 185215066
Stantec File Number: TUC-25-031

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
E II-B 51,748 815 Yes No
Separate Permits: None.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

There are no comments.

PLUMBING COMMENTS

Sheet P1.0

1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604]

2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly.

3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify.

ELECTRICAL COMMENTS

Sheet E1-SK

1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
03/13/2025 Commercial Plumbing Standard REQUIRES RESUBMIT March 6, 2025
1st Review

Shive-HatteryArchitecture+Engineering
Attn: Joel Mesik
4330 N. Campbell Avenue, Suite 268
Tucson, Arizona 85718

Re: JTED II
PLUMBING MODIFICATIONS

City of Tucson Permit Number: TC-COM-0325-00420
Stantec Project Number: 185215066
Stantec File Number: TUC-25-031

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, plumbing, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
E II-B 51,748 815 Yes No
Separate Permits: None.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

There are no comments.

PLUMBING COMMENTS

Sheet P1.0

1. Please provide updated water pressure calculations based on the additional fixtures added. [Ref. IPC 2018 Sec. 604]

2. The floor plans for the CTE Workroom are both labeled “Plumbing Waste 1st Floor Plan”. One floor plan is for the water supply and the other is for the sewer line connection. Please revise accordingly.

3. The Plumbing Waste 1st Floor Plan at the CTE Workroom indicates a Detail 219. The plumbing plans do not include a detail 219. Please clarify.

ELECTRICAL COMMENTS

Sheet E1-SK

1. The Plumbing Elec Schedule Indicates Notes 1 & 2 for the WH-12 but there is no indication what notes 1 and 2 imply. Please clarify.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
03/05/2025 Fire New Construction Standard REVIEW COMPLETED
03/05/2025 PDSD Application Completeness Express REVIEW COMPLETED