Permit Number: TC-COM-0324-00430
Parcel: 14041124E

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0324-00430
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/16/2024 Site Zoning APPROVED
04/11/2024 Site Engineering NOT REQUIRED
04/16/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
04/02/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Nicholas Baptiste
njnobaptiste@safebuilt.com
Denied
Reason:
Date Completed : 3/25/2024 10:32:33 PM
1. Sheet S2.0 (Mezzanine Foundation Plan) / Clarification. Both stairs on plan reference detail 2/S3.1. Revise reference to depict accurate detail.

2. Sheet S3.0 (Mezzanine Framing Plan) / Clarification. Both stairs on plan reference detail 2/S3.1. Revise reference to depict accurate detail.

3. Sheet S3.0 (Mezzanine Framing Plan) / Clarification. On plan depicts "RE.: 10/S4.1" with leader pointing to line that does not appear to be a framing member. Clarify if this is framing and/or revise reference leader to plan location where detail occurs.



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 3/15/2024 9:46:07 AM
1. General: Include the wall sections showing the new or existing insulation. Note number 07 sheets A1.1 and A1.2 states that the insulation starts at 12’ above the floor. Provide the COMcheck for the envelope. (2018 IECC section C402)

2. Sheet A0.0: The occupant load has not been correctly calculated. The conference rooms, training rooms, huddle room, break room, and spaces with tables and chairs are to be calculated using 1 person per 15sf. The reception area with only chairs is to be calculated using 1 person per 7sf. Please revise all affected sheets. (2018 IBC section 1004, Table 1004.5)

3. Sheets A1.1, A1.2: Show the means of egress travel paths from the most remote locations in the warehouse and office spaces. (2018 IBC sections 1001.1, 1017)

4. Sheets A1.1, A1.2, A3.1: Provide the accessible routes and details to the floor plans. Include the accessible dining/seating details. (2018 IBC section 1104, 1105, 1108.2.9, 2009 ICC A117.1 sections 402, 902)




Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 3/27/2024 1:54:52 PM

1. General - MAU #4 not included in ComCheck Mechanical Compliance Certificate - 2018 IBC Section [A]107.2.1Information on construction documents.

2. General - Provide Roof Plan. Show all clear dimensions of equipment to edges of building. Show clear dimensions of exhaust termination points to makeup air intake points. - 2018 IBC Section [A]107.2.1Information on construction documents. - 2018 IMC Section [BE]304.11Guards.

3. General - Provide Ventilation Calculation/Schedule. Reference Calculating System used on Schedule Header. - 2018 IBC Section [A]107.2.1Information on construction documents.

4. Plan Sheet M1.1 - FCU #2 SAD (supply air drops) CFM quantity do not match Fan Coil Schedule CFM quantities on Plan Sheet M2.1 - 2018 IBC Section [A]107.2.1Information on construction documents.

5. Plan Sheet M1.1 - FCU #5 SAD (supply air drops) CFM quantity do not match Fan Coil Schedule CFM quantities on Plan Sheet M2.1 - 2018 IBC Section [A]107.2.1Information on construction documents.



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 3/21/2024 2:44:27 PM

1. Clarify design intent on sheet E1.0. Numerous new fixtures have (EX) indicating they are existing fixtures to be rewired, yet MEP 1.0 Demolition Plan shows all of these fixtures as demo’d.

2. On sheet E2.1 could not locate the following Keyed Notes 4, 5, 7, and 8.

3. On sheet E3.0, Need to provide short circuit calculations for new panels. Short circuit calculations are required by Tucson Commercial Submittal requirements (2023). This is to inform the Electrical contractor on what required KAIC rated equipment to provide. If any of the new panels KAIC calculations exceed 22 KAIC, the electrical design sheets will need to be signed and sealed by an AZ licensed electrical engineer (not anticipated).

4. On sheet E3.0, need to call out size for panels NH3 and NH4.

5. for existing NH3 and NH4 panels on Riser diagram on sheet E3.0 need to provide a statement or estimated load calculation to show the existing panels NH3 and NH4 are large enough to support the added loads incurred by this design.

6. On panel schedule NH3A circuit 7,9,11 the conductor (shown on Riser) may be oversized for a 125-amp CB frame.



Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 3/31/2024 1:04:56 PM
First Plumbing Review:

1). Sheet A0.0: Need to address Building plan review Comment #2. update the plans in accordance with -IPC 2018 403.1

2). Sheet A3.1:Dual side by side lavatories need 30"center to center separation from each other. Update the lavatory distances according to -2018 IPC 405.3.1

3). Sheet P1.1: Water connections at scrubber machine need high hazard backflow protection. Add the required backflow protection per -2018 IPC 608.1, 608.3
04/05/2024 Fire New Construction REQUIRES RESUBMIT -Resolve all building comments.
-Add note to cover sheet. Building to be tested for emergency responder radio coverage. Testing shall be by PCWIN and report provided to TFD. This will be a deferred submittal if required. IFC 510.1.
john.vincent@tucsonaz.gov
5203495581
04/12/2024 Water - PDSD REQUIRES RESUBMIT Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
03/14/2024 PDSD Application Completeness REVIEW COMPLETED