Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0324-00430
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/02/2024 | Bldg Permits - Post Review Express | REVIEW COMPLETED | |||
| 10/02/2024 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | A portion of the building is exempt from the building thermal envelope requirements set forth in C402.1 per the following: 1. C402.1.1 Low-energy buildings exceptions #3 and #4 (City of Tucson Amendment to 2018 IECC). This S-1 Occupancy Group portion of the building has a peak design rate of energy of 0.094 W/sqft < 1.0 W/sqft. 2. The “B” Occupancy Group is separated from the Warehouse “S-1” Occupancy Group with a 6” metal framed wall insulated with R-19 batt insulation. Above roof deck insulation value is R-38. Both conditions exceed the minimum insulation R-value requirements. |
||
| 10/02/2024 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 10/02/2024 | Special Inspection Certificate Review (Deferred Submittal) Express | REVIEW COMPLETED |