Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0324-00430
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/08/2024 | Water - PDSD | APPROVED | |||
05/09/2024 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
04/25/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Nicholas Baptiste njnobaptiste@safebuilt.com Approved Reason: Date Completed : 4/21/2024 12:18:45 PM 1. Sheet S2.0 (Mezzanine Foundation Plan) / Clarification. Both stairs on plan reference detail 2/S3.1. Revise reference to depict accurate detail. (RESOLVED) 2. Sheet S3.0 (Mezzanine Framing Plan) / Clarification. Both stairs on plan reference detail 2/S3.1. Revise reference to depict accurate detail. (RESOLVED) 3. Sheet S3.0 (Mezzanine Framing Plan) / Clarification. On plan depicts "RE.: 10/S4.1" with leader pointing to line that does not appear to be a framing member. Clarify if this is framing and/or revise reference leader to plan location where detail occurs. (RESOLVED) Building(B) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 4/22/2024 1:25:19 PM Building review is approved. Subject to the field inspector's approval. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 4/24/2024 10:30:05 AM 1. (RESOLVED) - General - MAU #4 not included in ComCheck Mechanical Compliance Certificate - 2018 IBC Section [A]107.2.1Information on construction documents. 2. (RESOLVED) - General - Provide Roof Plan. Show all clear dimensions of equipment to edges of building. Show clear dimensions of exhaust termination points to makeup air intake points. - 2018 IBC Section [A]107.2.1Information on construction documents. - 2018 IMC Section [BE]304.11Guards. 3. (RESOLVED) - General - Provide Ventilation Calculation/Schedule. Reference Calculating System used on Schedule Header. - 2018 IBC Section [A]107.2.1Information on construction documents. 4. (RESOLVED) - Plan Sheet M1.1 - FCU #2 SAD (supply air drops) CFM quantity do not match Fan Coil Schedule CFM quantities on Plan Sheet M2.1 - 2018 IBC Section [A]107.2.1Information on construction documents. 5. (RESOLVED) - Plan Sheet M1.1 - FCU #5 SAD (supply air drops) CFM quantity do not match Fan Coil Schedule CFM quantities on Plan Sheet M2.1 - 2018 IBC Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 4/20/2024 12:08:02 PM 1. Clarify design intent on sheet E1.0. Numerous new fixtures have (EX) indicating they are existing fixtures to be rewired, yet MEP 1.0 Demolition Plan shows all of these fixtures as demo’d. Notes have been revised to indicate fixtures are to be relocated or reused. Resolved. 2. On sheet E2.1 could not locate the following Keyed Notes 4, 5, 7, and 8. Plans have been revised to include items with all keyed notes. Resolved. 3. On sheet E3.0, Need to provide short circuit calculations for new panels. Short circuit calculations are required by Tucson Commercial Submittal requirements (2023). This is to inform the Electrical contractor on what required KAIC rated equipment to provide. If any of the new panels KAIC calculations exceed 22 KAIC, the electrical design sheets will need to be signed and sealed by an AZ licensed electrical engineer (not anticipated). Fault current rating schedule has been added. Resolved. 4. On sheet E3.0, need to call out size for panels NH3 and NH4. Panel schedules for NH3 and NH4 have been added. Resolved. 5. For existing NH3 and NH4 panels on Riser diagram on sheet E3.0 need to provide a statement or estimated load calculation to show the existing panels NH3 and NH4 are large enough to support the added loads incurred by this design. Panel schedules for NH3 and NH4 have been added which include sizing calculations. Resolved. 6. On panel schedule NH3A circuit 7,9,11 the conductor (shown on Riser) may be oversized for a 125-amp CB frame. Feeder size has been revised. Resolved Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 4/22/2024 8:07:36 PM Second Plumbing Review:OK Resolved-1). Sheet A0.0: Need to address Building plan review Comment #2. update the plans in accordance with -IPC 2018 403.1 Resolved-2). Sheet A3.1:Dual side by side lavatories need 30"center to center separation from each other. Update the lavatory distances according to -2018 IPC 405.3.1 Resolved-3). Sheet P1.1: Water connections at scrubber machine need high hazard backflow protection. Add the required backflow protection per -2018 IPC 608.1, 608.3 |
||
05/09/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/19/2024 | PDSD Application Completeness | REVIEW COMPLETED |