Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0323-00792
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/05/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 06/29/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. The drawings still contain references to the International Residential Code. [Original comment: As an R-4 occupancy with 6 or more occupants, this dwelling unit is beyond the scope of the International Residential Code. The relevant code for the mechanical aspects of this project is the 2018 International Mechanical Code with Local Amendments. Change the code references from the IRC to the IBC, IMC, IECC, or other appropriate code.] 2. Bolting the condensing unit to the pad is not securing the refrigerant circuit access ports. The correct code reference is Section 1101.10, IMC 2018. [Original comment: Secure the refrigerant circuit access ports of the condensing unit to prevent unauthorized access. Reference: Section 1101.10, IMC 2018.] |
||
| 06/29/2023 | Commercial Plumbing | REQUIRES RESUBMIT | PVC pipe is not approved for use with natural gas (see Mechanical Note #8, Sheet 4 of 5). | ||
| 07/05/2023 | Commercial Structural | REQUIRES RESUBMIT | Please respond to the following: 1a.) R-4 maximum allowable is 10 clients (Indicate the Occupancy Classification, the number of clients on your drawing. You indicate 6 clients but you also mention 4 bedrooms with 2 beds each and 2 bedrooms with 1 bed each. Please clarify.) 1b.) Your first sheet indicates that this facility is for Behavioral Health Care Facility, Assisted Living for 18 years and older, Day Care for Adults? Please correct your drawing and identify only one type of operation. 1c.) Include a statement as part of your code analysis as to how the facility handles any persons receiving custodial care who require limited verbal or physical assistance responding to an emergency situation to complete building evacuation and self preservation. Specify Condition 1 or Condition 2 per IBC 310. 1d.) In an Emergency, show/locate the gathering area where it is safe from danger per IBC 310.5. 2.) Indicate the clear opening of the doors complying to ANSI A117. 3.) Not Used 4.) Show/locate the two grab bars at the Water Closet as well as the two grab bars at the Shower, make sure to indicate the installation of Structural Backer Board for these grab bars per IBC Chapter 11. 5.) Provide Emergency Escape & Rescue Openings per R310 at every bedroom/sleeping space. On the drawing adjacent to the opening(s), indicate the clear opening for both horizontally and vertically and provide the dimension from the finish floor to the bottom of the opening. Indicate if there are obstacles on either side of the opening. 6.) Not Used. 7.) A fire alarm is required [907.2.10], If they exist...indicate them on your drawing. If not...please propose to install them. Illumination with emergency backup power is required in all components of the means of egress system [1006]. Electrical work (conductors/wiring/breaker ONLY) related to the installation of Emergency Lights, Lighted Signs, Audible Fire/Smoke Alarms shall also be reviewed as part of this permit & will be inspected by City of Tucson inspectors [please locate those equipments (to be inspected by the Fire Department) on your plans so that our inspectors will know what wiring/breaker to inspect]. Any new renovation work must be included as part of this building permit. 8.) A Final inspection will be conducted by our inspectors prior to issuance of the Certificate of Occupancy. 9.) An Operator's License must be applied for with the State, the absence of this license shall void this building permit. 10.) Submit a copy of the State License application as part of the permit submittal. 11.) Please resubmit. | ||
| 06/13/2023 | Fire New Construction | REVIEW COMPLETED | |||
| 06/01/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |