Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Number: TC-COM-0226-00244
Parcel: 123100280

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0226-00244
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/17/2026 Commercial Building Standard APPROVED
03/12/2026 Commercial Electrical Standard APPROVED
03/16/2026 Commercial Mechanical Standard APPROVED
03/16/2026 Site Zoning Standard APPROVED
03/16/2026 Water - PDSD Standard APPROVED
03/11/2026 Outdoor Lighting Standard NOT REQUIRED No modifications to the outdoor lighting.
02/26/2026 Site Engineering Standard NOT REQUIRED
03/18/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/16/2026 Commercial Plumbing Standard REQUIRES RESUBMIT 1. Show that the proposed reduced pressure zone backflow prevention assembly will be installed in an accessible, non-concealed location per the manufacturer’s installation instructions. The air gap and drain line from the reduced pressure zone backflow prevention assembly shall be piped from the relief valve connection to a clearly visible discharge location with an air gap and that will prevent the occurrence of water damage. Reference: Sections 608.14 and 608.14.2, IPC 2024.
2. The proposed drain box has a 2” waste outlet; reducing the trap to 1-1/2” is not allowed. Reference: Section 704.2, IPC 2024.
3. Provide a detail; showing how the new lavatory, L-1, and drain box, DB-1, are to be connected to the existing waste and vent piping. Reference: Sections 1002.1, IPC 2024.

If you have any questions about this review comment, I can be reached at Robert.Sherry@tucsonaz.gov.
03/18/2026 Fire New Construction Standard REVIEW COMPLETED
02/24/2026 PDSD Application Completeness Express REVIEW COMPLETED