Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0226-00166
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/10/2026 | Outdoor Lighting Standard | NOT REQUIRED | No modifications to the outdoor lighting. | ||
| 03/03/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/27/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. Please submit the structural calculations and the construction drawings as separate pdf uploads. IBC 107.2.1 2. Provide the City of Tucson Special Inspection Certificate(s) with Parts A and B completed with the next submittal. IBC 107.1 SI form link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf 3. Please include special inspection covering welding with next submittal. IBC 107.2.1 Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 02/10/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0226-00166 (130 S SCOTT AV TUCSON, AZ 85701) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov Electrical Review: 1. Provide a Grounding Electrode System at the detached structure per NEC 690.47. 2. Show the Grounding Conductor’s connection at the modules, mounting and metal support structure. 3. Show grounding details for the mounting equipment and metal support frame, NEC690.43. 4. There is existing mechanical/HVAC equipment in front of the service equipment and in the space where the new PV equipment will be placed. Please verify and show that the mechanical/HVAC equipment is not violating the clear working space required by the electrical panels/equipment, 2017 NEC 110.26(A) |
||
| 03/02/2026 | Design Review Standard | REQUIRES RESUBMIT | Property is located within the boundaries of the Rio Nuevo Area overlay zone, with the existing structure on site designated as contributing to the Armory Park National Register Historic District. A Design Package must be submitted as a subrecord of a Development Package for RNA and historic preservation review, following these instructions: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/submission-documents/special_districts_application_instructions_7.18.23.pdf. The Design Package will need to go through review of the Tucson Pima Country Historical Commission's Plans Review Subcommittee (PRS) and the Design Review Board (DRB). Here's an overview of the RNA/historic review process: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/planning-amp-zoning/rna-application-and-review-process.pdf. If you have any questions, please let me know: maria.gayosso@tucsonaz.gov. Thank you. | ||
| 03/03/2026 | Historic | REQUIRES RESUBMIT | Follow the instructions provided by Maria Gayosso. | ||
| 02/12/2026 | Site Engineering Standard | REQUIRES RESUBMIT | Permit Activity Number: TC-COM-0226-00166 Project: Parking lot solar canopy Location: 130 S SCOTT AV Review Date: 2/12/2026 Reviewer: Marco Contreras – Engineering Associate - Site Engineering Site Engineering Comments: 1. The proposed new parking solar canopy/array to the existing site will require the submission of a Development Package Site plan UDC 7.4.3.E as this constitutes as site work. In accordance with Unified Development Code (UDC) Article 3.3.3.G.2.c, a site plan (Development Package Permit) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. 2. Site Engineering is unable to review and approve permit TC-COM-0226-00164 until the associated Development Package is reviewed and approved by all reviewers. 3. For formatting requirements for the development package submission, refer to Administrative Manual 2-06.0.0 Sections 3.0 – 4.9 4. Note for Development package review - Provide a height call-out for the proposed solar canopy on the site plan. As well as on the canopy details. To review compliance with UDC 7.4.6.F.2 & UDC 7.4.6.E.2. It is required that the required the canopy either follow the required height clearance of 15 – feet or be setback one foot or greater from the PAAL If you have any questions or concerns, please contact Marco Contreras at Marco.contreras@tucsonaz.gov |
||
| 02/25/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons PDSD Zoning Review Section PROJECT: TC-COM-0226-00166 130 S. Scott Ave. Tucson, AZ 85701 Parking Structure Solar Array (1st Review) TRANSMITTAL DATE: 2/25/2026 Comment: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. This site is located in the OCR-2 zone (UDC 4.7.27). 1. Comment: The proposed parking structure solar array will require a Development Package. Per UDC Article 3.3.3.G.2.c, a site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building permit. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes/Zoning-Code#section-1 2. Comment: As this site is located within the COT Downtown Core and Rio Nuevo Area (RNA), RNA review must be completed and approved prior to zoning approval of this building permit. Please contact Maria Gayosso at Maria.Gayosso@tucsonaz.gov if you have questions about the RNA review process. Site Zoning cannot approve this permit until the associated development package and RNA review have been approved. Additional information about RNA requirements can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/3/pdsd/documents/planning-amp-zoning/rna-application-and-review-process.pdf. 3. Comment: Additional comments may be forthcoming based on responses to zoning comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 02/26/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/04/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |