Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address:
130 S SCOTT AV
Address NEW:
130 S SCOTT AV
Apply Date:
02/04/2026
Applicant:
Joe Alitiem
Description:
Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE

Permit Reviews

Permit Number - TC-COM-0226-00166
Permit Status: Inspections complete
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Start Date Submittal Complete Date Status  
05/26/2026 ADMINISTRATIVE v.2 05/26/2026 APPROVED Review Details
05/08/2026 COMMERCIAL REVIEW - FULL v.4 05/13/2026 APPROVED Review Details
05/26/2026 SPECIAL INSPECTION REVIEW v.1 05/26/2026 REQUIRES RESUBMIT Review Details
03/13/2026 COMMERCIAL REVIEW - FULL v.2 04/03/2026 REQUIRES RESUBMIT Review Details
02/04/2026 COMMERCIAL REVIEW - FULL v.1 03/03/2026 REQUIRES RESUBMIT Review Details
04/24/2026 COMMERCIAL REVIEW - FULL v.3 05/07/2026 REQUIRES RESUBMIT Review Details
05/13/2026 ADMINISTRATIVE v.1 05/13/2026 REQUIRES RESUBMIT Review Details
07/14/2026 SPECIAL INSPECTION REVIEW v.1 07/16/2026 APPROVED Review Details
05/26/2026 SPECIAL INSPECTION REVIEW v.2 05/27/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0226-00166
Permit Status: Inspections complete
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Total Outstanding Activity Conditions - 3
Date Name
02/27/2026 SPECIAL INSPECTION INSPECTION OF CONCRETE CONSTRUCTION IS REQUIRED.
02/27/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/27/2026 SPECIAL INSPECTION INSPECTION OF STRUCTURAL STEEL IS REQUIRED.

Conditions

Permit Number - TC-COM-0226-00166
Permit Status: Inspections complete
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Date Description Comments
02/04/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
02/27/2026 SPECIAL INSPECTION INSPECTION OF SOILS IS REQUIRED.
02/27/2026 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0226-00166
Permit Description: Install a parking structure solar array. SCOPE OF WORK SYSTEM SIZE : STC : 84 X 545W= 45.78 KW DC PTC : 84 X 502.2W = 42.18 KW DC AC SIZE: 60.0 KW AC 84) LONGI SOLAR LR5-72HBD-545M (545W) MODULES (01) SOLIS S5-GC60K-LV-US (208V) INVERTER. Install a new 75KVA TRANSFORMER PRIMARY-240V DELTA SECONDARY-120/208V WYE
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/14/2026 COT - CSOL - Electrical Intermediate Solar Project Passed
07/14/2026 COT - FCON - Fire - Final Passed
07/14/2026 COT - CSOL - Electrical Final Solar Project Passed
07/14/2026 COT - LCBU - Building Final Passed
07/14/2026 COT - LCEL - Electrical Final Passed
07/14/2026 ENGR Engineering Final Passed
07/13/2026 TRSP - ROW - Final/Close-Out Passed
07/14/2026 COT - CSOL - Electrical Underground Solar Project Passed
07/28/2026 BULD - Electrical Clearance Passed Passed CLEARANCE RECN