Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0224-00336
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/14/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
04/09/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 4/5/2024 7:36:54 PM 2. Sheet A2.00 – Provide 1 hour rated wall assembly UL listed wall assembly detail. Note 107 shows existing steel stud wall to be 1 hour rated wall but wall detail and UL listed assembly number is missing. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 4/5/2024 7:39:04 PM 8. Sheet A1.00 – Show the furthest common path of travel from cooler room (Provide labeling in all rooms) and show travel distance of exit and common path of egress travel per 2018 IBC section. Show required and provided distance of each exit access travel distance per table 1006.2.1 and 1017.2. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 4/5/2024 7:38:15 PM 2. Sheet A0.01 sheet index shows mechanical sheets M1.0 and M2.0 but only sheet M3.0 is provided. Provide coordinated and complete mechanical plans. Provide existing/demolition and new mechanical plans. 3. Sheet M3.0 – Also labeled as “M-102” that’s not showing the scope of new restaurant. Mechanical units are for reception and working stations that is office space. 4. Sheet M3.0 – Referencing “2012” International Mechanical Code that’s not applicable in City of Tucson. 5. Provide mechanical floor plans – fully dimensioned mechanical plans showing duct layouts, inlet and outlet sizes, equipment locations, fire and smoke dampers when applicable. 6. Provide equipment schedules – To include all equipment, listed and sized. 7. Provide ventilation calculations – Provide calculations according to 2018 IMC. 8. Provide energy code calculations – Provide calculations (COMcheck) according to 2018 IECC. Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 4/5/2024 7:38:39 PM 4. Provide new panel “B” breaker schedule that’s including new mechanical equipment such as electrical water heater in sheet P4.0 2017 National Electrical Code section 408.4(A) Every circuit and circuit modifications shall be legibly identified as to its clear, evident, and specific purpose to use. Section 408.30 panelboards shall have a rating not less than the minimum feeder capacity required for the load calculated. Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 4/5/2024 7:37:27 PM 4. Provide location and detail of grease interceptors according to City of Tucson amendments to the 2018 International Plumbing Code section 1003.3. Subjected fixtures should be connected to a grease interceptor located within the kitchen area. Sheet P2.0 showing “sewer connection” but missing grease interceptor. 5. Provide grease interceptor calculation and sizing per gravity grease interceptors’ table. Note: hydromechanical grease interceptors also in section 1003.3. |
||
04/14/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/04/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |