Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0224-00336
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/26/2024 | Site Zoning | APPROVED | |||
03/18/2024 | Site Engineering | NOT REQUIRED | |||
03/26/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
03/11/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 3/9/2024 2:09:28 AM 1. Provide existing/demolition plan to clarify new scope. Building(B) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 3/9/2024 2:10:09 AM 0. Sheet A0.001 – Listed Governing Building Codes following City of Tucson are incomplete and misleading such as “2018 International and Uniform Plumbing Codes.” Select and provide applicable accessible code. City of Tucson IBC Local Amendments • Amendments to the 2018 International Building Code • Amendments to the 2018 International Existing Building Code • Amendments to the 2018 International Energy Conservation Code • Amendments to the 2018 International Fuel Gas Code • Amendments to the 2018 International Mechanical Code • Amendments to the 2018 International Plumbing Code • Amendments to the 2018 International Residential Code • Amendments to the 2018 International Swimming Pool & Spa Code • Amendments to the 2017 National Electrical Code • Amendments to the 2018 International Fire Code • City of Tucson/Pima County Outdoor Lighting Code • Arizona Administrative Code Title 18 Chapter 5 for public and semi-public swimming pools • ICC A117.1 - 2009 Accessible and Usable Buildings and Facilities (by reference) Adopting Local Amendments to the Building Code is authorized by Ordinance #11590. 1. Sheet A0.01 – Key note 102 states as “No work this area” however there are overlapping stairs showing. Is there a propose new stairs? Clarify the scope of work and coordinate S/MEP disciplines. 2. What’s the scope of fire alarm system? 3. List any differed submittals and special inspections. 4. Sheet A1.00- Label/identify the accessible wheel chair space. 2018 International Building Code Section 1108.2.9 states in dining and drinking areas, all interior and exterior areas shall be accessible and be on an accessible route. 5. Sheet A1.00 – Construction type shows as “V-B” but sheet A00.1 set as “V-A” which is it? 6. Provide existing/demolition plan to clarify new scope. Mechanical(M) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 3/9/2024 2:09:12 AM 1. Provide existing/demolition plan to clarify new scope. Electrical(E) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 3/9/2024 2:08:36 AM 1. Sheet E4.0 – Missing total load demand of 200A panel B: A.I.C rating and total KVA load. 2. Sheet E5.0 - Missing single line diagram including voltage and phase, panel and/or transformer size, feeder loads, rating breakers or fuses including A.I.C., Complete fault current analysis and total tenant and building service load. 3. Provide existing/demolition plan to clarify new scope. Plumbing(P) Reviewer Kimiyoshi Shimabukuro kshimabukuro@safebuilt.com Denied Reason: Date Completed : 3/9/2024 2:08:54 AM 1. Sheet P1.0 and P2.0 – Text and labeling are too light and small to read. Use appropriate legible scale and line types or provide in enlarged scale. 2. Sheet P4.0 – “2006 International Plumbing Code” is the not applicable code. 3. Provide existing/demolition plan to clarify new scope |
||
03/18/2024 | Fire New Construction | REQUIRES RESUBMIT | -Resolve all building comments. john.vincent@tucsonaz.gov 5203495581 |
||
02/26/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |