Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0224-00311
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2024 Water - PDSD APPROVED
03/11/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
03/05/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Provide 2018 IECC compliance for the exterior lighting.

2 The Outdoor Lighting Special Inspection Certificate must be submitted with the first part sealed by the registrant responsible for the Special Inspection. The certificate must be submitted prior to approval of the electrical plan review.

Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC, 2012 City of Tucson Outdoor Lighting Code.
03/11/2024 Commercial Mechanical REQUIRES RESUBMIT Clarify the specifications for AC-1. The Carrier model 50GC*M05 does not appear to be a heat pump, but a cooling only unit with no heating capacity. Reference: Section 107.2.1, IBC 2018.
03/07/2024 Commercial Plumbing REQUIRES RESUBMIT 1. The Plumbing Fixture Schedule calls out, “0.5 GPM MAX PER CYCLE” for the lavatory faucet. Revise the description to limit the cycle time to 30 seconds to comply with the requirement to dispense only 0.25 gallons per cycle. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09.
2. The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout (i.e. the invert is 7.10 feet below the rim of the cleanout rim, the maximum horizontal distance is 92.90 feet). Reference: Section 708.1.1, IPC 2018.
3. An approved 2-way cleanout fitting is a single fitting, not a field-assembled group of individual fittings as shown in detail 4/P4.1. (Note that the IPC does not require the installation of a 2-way cleanout.) Reference: Section 708.1.8, IPC 2018.
03/07/2024 Commercial Structural REQUIRES RESUBMIT TC-COM-0224-00311 (4401 S TUCSON ESTATES PW TUCSON, AZ 85735)
New City of Tucson Hayden Udall Warehouse will provide: • New organized and convenient storage spaces. • New offices, workspaces, and support spaces for Tucson Water staff. Note: All Landscape and Native Plant Preservation Plan by COT
Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.
1. Sheet T0.0: Please amend Governing Codes to add
• 2009 ICC A117.1 Accessibility Code (by reference),
• 2018 International Mechanical Code (IMC),
• 2018 International Plumbing Code (IPC),
• 2017 National Electrical Code (NEC),
• City of Tucson/Pima County Outdoor Lighting Code
• As Amended by the City of Tucson -Local Amendments to Above Codes ( www.tucsonaz.gov/pdsd/building-codes )

2. Sheet T0.0: Please amend plans to provide a description of the work involved in this permit’s scope. IBC 105.3 For example is the Covered Storage Yard included in this permit.

3. Sheet T0.0: Please clarify which items within the Delegated Design Submittals/Additional Permits Required are deferred submittals and which items require a separate permit. For example, the signs will require a separate permit. Additionally, please provide a list of the deferred submittals with a note to not install until approved. IBC 107.3.4.1

4. Sheet T0.0: Please amend plans to name the Registered Design Professional in Responsible Charge, with contact info. IBC 107.3.4.

5. Sheet T0.0 Further, related to the comment above, please have the Registered Design Professional in Responsible Charge of this project complete and return the City of Tucson Special Inspections Certificate with signatures.

6. Sheet C3.0: Please update ICC/ANSI code reference to the 2009 edition. Additionally, please amend the plan to show the accessible route connecting accessible buildings, accessible facilities, accessible elements and accessible spaces that are on the same site. IBC 1104.2

7. Sheet A12.0: Please amend plans to provide an accessible check-out counter and provide elevation of accessible drink fountain. IBC Chapter 11

Specifications
8. Specifications: Under Cast-In Place Concrete, as well as other locations, it appears some of the variables were not selected. Please review and rectify if any discrepancies are found. IBC 107.2.1 For example, 7. Limit water-soluble, chloride-ion content in hardened concrete to [1.00] [0.30] [0.15] <Insert number> percent by weight of cement.033000-7 Treat as typical comment for the Specifications.

Mark Masek
Plans Examiner
Mark.masek@tucsonaz.gov
520-837-4994
02/29/2024 Site Engineering REQUIRES RESUBMIT 1. Site Engineering cannot approve TC-COM-0224-00311 until the associated development package, TD-DEV-0224-00047, is approved.

Lianne Evans
lianne.evans@tucsonaz.gov
02/29/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0224-00311
4401 S Tucson Estates Pkwy. Tucson, AZ. 85735
Tucson Water Site Improvements

TRANSMITTAL: February 29, 2024

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. As development package (DP), TD-DEV-0224-00047, has not completed its 1st review Zoning is not able to review the building permit for compliance with the DP and will review on the next submittal. Zoning cannot approve the building plans until the DP is approved by all review agencies.

If you have any questions about this transmittal, please contact Nathan.Herrera@tucsonaz.gov.
02/27/2024 Fire New Construction REVIEW COMPLETED
02/21/2024 PDSD Application Completeness REVIEW COMPLETED