Permit Number: TC-COM-0224-00258
Parcel: 13811089A

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0224-00258
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/12/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/12/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

Per the description for the scope of work, the applicant entered the following,

“Permit in order to re-energize Meter 147568409 “Safety Clearance Inspection” by City Rule. Due to it not being energized for 6 months or more. No other work is being done to this power source - meter at this time.” 6347 S Fontana Ave #18.

The plan submitted shows Unit #18 as an existing Mobile Home.

These are the same plans Sealed by Monrad Engineering submitted as T22CM01299 for the electrical Upgrades to the site, including 4- new multi-metered electrical services, new underground feeders and MH pedestals.

Please clarify the correct scope of work. Per 3 way phone conversation with Monrad Engineering, and Jorge Contreras, and the City of Tucson PDSD Commercial Electrical Plans Examiner Dan Santa Cruz, on 1-13-2024 @ 5:23 pm, it was agreed, that the electrical infrastructure was in need of upgrading.

Now it appears that the applicant Jorge Contreras has changed his mind, withdrew the original permit application T22CM01299 and is now applying for a different type of permit TC_COM-0224-00258 ‘Electrical Reconnect’ to an existing electrical service for Unit #18, But still is submitting the same original plans for the new site electrical infrastructure.

The plan(s) submitted, and the scope of work description for TC-COM-0224-00258 do not correlate. Please clarify.

Ref; 2018 IBC section 107.2.1, 2017 NEC.
02/08/2024 PDSD Application Completeness Express REVIEW COMPLETED Electrical reconnect only (No new work)