Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0223-00705
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/07/2023 | External Reviewers - Stantec | APPROVED | |||
| 03/07/2023 | Site Engineering | APPROVED | |||
| 03/24/2023 | Site Zoning | APPROVED | |||
| 07/07/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/05/2023 | Fire New Construction | REQUIRES RESUBMIT | -Elevator shall comply with IFC 1009.4.1 for standby power. -IFC 1009.8. Two way communication shall be provided at the elevator landing other than the landing at the level of exit discharge. Add two way communications to the drawings or indicate it will be part of the FA deferred submittal. -Sheet E3.0 indicates the building will be tested for ERRC. This is not required unless the bldg is over 35'. You can leave the note if you plan on testing the building or remove the note. If you leave the note, bldg will need to be tested by PCWIN for radio coverage. |
||
| 03/06/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |