Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0223-00664
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/14/2023 | Site Zoning | APPROVED | |||
03/20/2023 | Site Engineering | NOT REQUIRED | |||
03/29/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/29/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0223-00664 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1. New 7 Condensing Units HP-1 thru HP-7 weighing up to 292 pounds, one Outdoor Unit ODU-1 weighing 93 pounds and a Fan weighing 29 pounds is added at existing roof (Refer to Drawings M-101, M-201 and A-530). Provide Structural Calculations for the Roof Supporting members checking their adequacy to carry additional loads from these new units. 2. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Denied 1. Where duct penetrates more than 2 stories it shall be protected by a shaft for the bathroom exhaust on sheet M-100 separation between B & E occupancy in table 508.4 of the IBC requires a 1 hour separation (IMC2018,607.6.1) 2. Appliances installed on roof's above 16" from grade shall be provided with an approved permanent means of access sheet M-101 (IMC2018306.5) 3. on your ventilation outside air schedule for room #108 you got required outside airflow at 283 cfm's but AHU-1 is only bringing in 240cfm's. also the total air required for AHU-2 total required air is 222cfm and your only bringing in 205cfm's also AHU-4 required is 320 cfm's your only bringing in 300 cfm's please correct pm sheet M-201 (IMC2018,403.3.1.1.1) ELECTRICAL REVIEW COMMENTS Conditionally Approved FYI for future submittals for Tucson: Tucson require’s short circuit calculations for panels to confirm that KAIC ratings are sufficient for new panels. This review is approved as Panel's were spec'd at 22 KAIC, a value 2x higher than standard 240 VAC rated panels. PLUMBING REVIEW COMMENTS: Denied First Plumbing Review: 1). Provide the water piping sizing calculations used on plan page P-100 to show the 3/4" cold is sufficient for distance & all the fixtures shown. -IPC 604.1 If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
03/21/2023 | Fire New Construction | REVIEW COMPLETED | |||
03/10/2023 | PDSD Application Completeness | REVIEW COMPLETED |