Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0125-00163
Parcel: 13419042D

Review Status: In Review

Review Details: COMMERCIAL REVIEW - LIMITED v.5

Permit Number - TC-COM-0125-00163
Review Name: COMMERCIAL REVIEW - LIMITED v.5
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
01/15/2026 Commercial Building APPROVED
01/21/2026 Restamp Commercial Electrical APPROVED
01/21/2026 Restamp Site Engineering APPROVED
01/21/2026 Restamp Site Zoning APPROVED
01/21/2026 Water - PDSD APPROVED RESTAMP
N/A Bldg Permits - Post Review Express PENDING ASSIGNMENT
N/A Restamp Commercial Mechanical PENDING ASSIGNMENT
N/A Restamp Commercial Plumbing PENDING ASSIGNMENT ACTIVITY NO. TC-COM-0125-00163
ADDRESS/PARCEL: (7200 E BROADWAY BL Unit:UNIT 100 TUCSON, AZ 85710)

Submit your revised drawings along with a detailed response letter, which states how all comments were addressed. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review.

If you have any questions about these review comments, I can be reached at Sean.Severson@tucsonaz.gov

COMMENTS:
1. Provide specifications for the “water cooler” noted on sheet A1.0 in the plumbing fixture calculations table. The water dispenser must be connected to a permanent supply of potable water and must be listed and labeled in accordance with the Code. It must be installed with a permanently mounted disposable cup dispenser. The cup dispenser shall be located adjacent to the water dispenser with the dispensing end between 34” and 48” above the finished floor. See: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/2008-21_e_drinkingfountainpolicy.pdf
12/31/2025 PDSD Application Completeness Express REVIEW COMPLETED
01/21/2026 Restamp Fire New Construction REVIEW COMPLETED