Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
01/24/2025
Applicant:
Christopher McManus
Description:
T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures

Permit Reviews

Permit Number - TC-COM-0125-00163
Permit Status: Inspections complete
Permit Description: T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures
Start Date Submittal Complete Date Status  
10/02/2025 COMMERCIAL REVIEW - LIMITED v.3 10/02/2025 REQUIRES RESUBMIT Review Details
01/31/2025 COMMERCIAL REVIEW - LIMITED v.1 02/15/2025 REQUIRES RESUBMIT Review Details
02/17/2026 COMMERCIAL REVIEW - LIMITED v.6 02/18/2026 APPROVED Review Details
10/03/2025 COMMERCIAL REVIEW - LIMITED v.4 10/21/2025 REQUIRES RESUBMIT Review Details
12/31/2025 COMMERCIAL REVIEW - LIMITED v.5 02/17/2026 REQUIRES RESUBMIT Review Details
05/28/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/29/2026 APPROVED Review Details
09/08/2025 COMMERCIAL REVIEW - LIMITED v.2 09/08/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0125-00163
Permit Status: Inspections complete
Permit Description: T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures
Total Outstanding Activity Conditions - 1
Date Name
02/12/2025 AIR BALANCING REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0125-00163
Permit Status: Inspections complete
Permit Description: T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures
Date Description Comments
01/31/2025 Please contact Pima County Addressing to confirm unit number. Addressing@pima.gov or 520-724-9512
01/31/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
01/31/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/12/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0125-00163
Permite Description: T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/10/2026 COT - LCPL - Plumbing Intermediate N/A Partial Pass Walls and hard lids
03/10/2026 COT - LCME - Mechanical Intermediate N/A Partial Pass Walls and hard lids
03/10/2026 COT - LCEL - Electrical Intermediate N/A Partial Pass Walls and hard lids
06/01/2026 COT - FCON - Alarm - Final N/A Not Applicable
06/01/2026 COT - FCON - Sprinkler - Final N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0125-00163
Permit Description: T.I. with one additional toilet. Otherwise keeping all existing plumbing, HVAC, and electrical, just updating fixtures
Total Completed Inspections - 15
Date Description Inspector Results Comments
02/23/2026 COT - LCPL - Rough Soil Passed
02/23/2026 COT - HCEL - Electrical Underground Passed
03/11/2026 BULD - Electrical Clearance Passed RECN

TEP
05/07/2026 COT - HCBU - Building Above Ceiling Passed
05/07/2026 COT - HCEL - Electrical Above Ceiling Passed
05/07/2026 COT - HCME - Mechanical Above Ceiling Passed
05/07/2026 COT - LCPL - Plumbing Intermediate Passed
05/07/2026 COT - LCME - Mechanical Intermediate Passed
05/07/2026 COT - LCEL - Electrical Intermediate Passed
06/01/2026 COT - FCON - Fire - Final Passed
06/01/2026 COT - LCBU - Preslab Passed
06/05/2026 COT - LCEL - Electrical Final Passed Passed
06/05/2026 COT - LCBU - Building Final Passed Passed
06/05/2026 COT - LCME - Mechanical Final Passed Passed
06/05/2026 COT - LCPL - Plumbing Final Passed Passed

Documents

File Name Document Type  
CALDWELL WATZA - OASIS HEALTH LAB RESULTS-2026-05-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-COMPLETE SET-OASIS HEALTH_V5.PDF DOCUMENTS VIEW