Permit Number: TC-COM-0125-00160
Parcel: 141113890

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0125-00160
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/06/2025 Commercial Electrical Standard APPROVED
05/27/2025 Commercial Mechanical Standard APPROVED
05/06/2025 Outdoor Lighting Standard APPROVED
06/04/2025 Site Engineering Standard APPROVED
05/28/2025 Site Zoning Standard APPROVED
05/27/2025 Water - PDSD Standard APPROVED
06/04/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
05/27/2025 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Please amend the structural calculations to add the Designer’s seal, signature, and date signed on all necessary sheets. IBC 107.1
New**Please see NEW COMMENTS FROM SECOND REVIEW 5/27/2025 expanded comments below.**
2. Please provide the special inspection certificate with Part A, and Part B, completed with next submittal. IBC 107.2.1
https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf
New** Please list the same special inspections on the certificate as required on sheet SP1. For example,
A. SOILS PER IBC SECTION 1705.6 INCLUDING EARTH WORK, COMPACTION, GRADING
AND FILLING.
B. CONCRETE CONSTRUCTION PER IBC SECTION 1705.3 AND TABLE 1705.3.
C. STEEL CONSTRUCTION PER IBC SECTION INCLUDING HIGH STRENGTH BOLTS
D. ANCHOR BOLTS INSTALLED IN CONCRETE
-REVIEW INSTALLATION PROCEDURES PER SPECIFIED ICBO REPORT.
**NEW COMMENTS FROM SECOND REVIEW 5/27/2025**
**4. Provide site specific (containing the same site address as the permit) Structural Calculations for the Building sealed by the Structural Engineer. IBC 107.2.1
**5. Provide site specific (containing the same site address as the permit) Foundation Calculations for the Building sealed by an Arizona licensed registrant. IBC 107.2.1
**6. Please amend the Metal Building construction drawings to show the same address in the Title Block as the permit. IBC 107.2.1
**7. Please amend the plans to provide another exit as the travel distance appears to exceed the 100-foot limitation in IBC Table 1006.2.1 The method used to measure the travel distance is expected to be a rectilinear path similar to what can be experienced in most occupancies, such as a schoolroom or an office with rows of desks or storage occupancy with items stored. The “arc” method, using an “as the crow flies” linear measurement, must be used with caution, as it seldom represents typical floor design and room layout and, in most cases, would not be the natural, unobstructed path. IBC 1017.3
Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
05/27/2025 Commercial Plumbing Standard REQUIRES RESUBMIT 1. The submitted water heater specifications show either a “mechanical” unit and a “thermostatic” unit. Tempered water is required for the restroom lavatory, using an approved device conforming to ASSE 1070. Reference: Sections 416.5 and 607.1.2, IPC 2018 [Initial comment: Provide the specifications and listing information for the proposed instant water heater. Reference: Sections 303.2 and 501.5, IPC 2018 and Section 107.2.1, IBC 2018.]
2. Clarify the size of the water service to the building. The revised plumbing isometric shows a ¾” water service to the building but the plumbing plan shows a 1” water service.
05/05/2025 PDSD Application Completeness Express REVIEW COMPLETED