Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0125-00139
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/05/2025 | Commercial Electrical Standard | APPROVED | |||
| 02/05/2025 | Outdoor Lighting Standard | APPROVED | |||
| 02/13/2025 | Water - PDSD Standard | APPROVED | |||
| 02/20/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/19/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. 1. Please amend plans to provide a list of deferred submittals on the cover or code data sheet with a note to not install until approved. IBC 107.3.4.1 2. Please provide the GEOTECHNICAL REPORT 24-077 BY PATTISON ENGINEERING, LLC DATED OCTOBER 31, 2024, with your next submittal. IBC 107.2.1 3. Please provide the special inspection certificate with Part A, and Part B, completed with next submittal. IBC 107.2.1 https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 02/13/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Revise the sequence of operation for the restroom exhaust fan so that all of the air supplied to the restroom will be exhausted (i.e. all of the air supplied to the restroom is to be exhausted during the hours of operation even if the lights are off). Reference: Section 403.2.1 (4), IMC 2018. | ||
| 02/13/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. An approved development plan is not to be used for construction of on-site utilities (e.g. water service to the building, building sewer, etc.). Provide a site plan showing the installation of the water service to the building and for the installation of the building sewer from the building to the connection to the public sewer. Reference: Sections 107.2.1 and 107.2.6, IBC 2018. 2. Termination of the excess pressure relief from the water heater, P8, over an elevated service sink, P4, is not an approved location. Reference: Section 504.6 (6), IPC 2018. |
||
| 02/20/2025 | Site Engineering Standard | REQUIRES RESUBMIT | 1. Until the Development Package is approved engineering can't approve the building permit. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
||
| 02/20/2025 | Site Zoning Standard | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0125-00139 - TD-DEV-0125-00006 10096 E OLD VAIL RD. – PAD-36 Membership Organization – Site Wall (2nd Review) TRANSMITTAL: February 20, 2025 This site is located in PAD-36 (UDC 4.7.24). Automotive: Minor Service and Repair is an allowed use in the PAD. 1. As TD-DEV-0125-00006 has not completed its first review Zoning is not able to review the building plans for compliance with the DP. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 02/06/2025 | Fire New Construction Standard | REVIEW COMPLETED | 1. Install fire extinguishers as required by the 2024 IIFC Section 906. 2. Install an NFPA 704 Diamond at the oil -chemical storage room-door. |
||
| 01/29/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |