Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0124-00210
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/11/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/02/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/30/2024 11:13:12 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 10/2/2024 1:31:25 PM 1. General - Provide Gas line piping plan. Show all equipment, valves, dirt legs, vibration isolators, pipe supports. Show all underground and above ground piping. Designate the plans to Mechanical or Plumbing for review. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC – Section [A]107.2.1Information on construction documents. 2. General - Provide Gas line isometric drawing. Show all equipment, valves, dirt legs, vibration isolators, pipe supports. Designate the plans to Mechanical or Plumbing for review. - 2018 IECC Section C103.2Information on construction documents. - 2018 IBC – Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 9/30/2024 9:44:46 AM |
||
| 10/11/2024 | Site Engineering | REQUIRES RESUBMIT | |||
| 10/11/2024 | Site Zoning | REQUIRES RESUBMIT | |||
| 09/27/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |