Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 14111459B
Parcel Search
Parcel Attributes
| Parcel | 14111459B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-2 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/15/2025 8:36 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 14111459B
Date - 12/15/2025 8:36 a.m.
Total Number Of Permits - (9)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-COM-0124-00210 | Issued | 01/30/2024 | 01/26/2026 | Commercial Building | Electrical equipment foundations and pipe supports | |
| TR-UTL-0324-00427 | Complete | 03/01/2024 | 04/14/2024 | Right-of-Way (ROW) - Utility | Installing 8" FH, 2-1" service connections with 5/8" irrigation meter and 1" potable meter | |
| TR-UTL-0325-00414 | Complete | 03/11/2025 | 07/18/2025 | Right-of-Way (ROW) - Utility | Traffic control for water truck for work within TEP easement on North side of Old Vail. Clearing of trees in conflict with edge of Easement. Installation of TEP Pull boxes | |
| TR-ROW-0324-00292 | Complete | 03/14/2024 | 04/20/2024 | Right-of-Way (ROW) | Remove 116’L of Curb and 116’ X 2’ of asphalt and 116’ of side walk and install new asphalt driveway and 2 standard ramps.*** | |
| TR-UTL-0325-00480 | Complete | 03/21/2025 | 09/03/2025 | Right-of-Way (ROW) - Utility | WO T103530. TEP to install and make-up PME cabinets / extend underground primary cable. Make up (customer installed) underground pull boxes. Extend primary cable from existing pull boxes. No excavation work required. | |
| TC-COM-0525-01042 | Inspections complete | 05/22/2025 | 01/26/2026 | Commercial Building | New Conex office building - per JG | |
| DP22-0267 | Complete | 09/26/2022 | 07/31/2028 | Development Package | Revision 3 - Site/Grading/Swppp - VoltaGrid Rita Ranch. Gas distribution center, utilities - distribution system. | |
| TC-CFO-1124-00230 | Denied | 11/20/2024 | N/A | Certificate of Occupancy | This project can only receive a Letter of completion. The plans that were submitted do not have a Code Analysis, Floor Plan, and Site Plan. In order to receive a Temp C of O/ C of O please submit required stamped plans. We cannot evaluate the construction for code compliance without the additional information for the entire structure. Any questions you may have please reach out to Building Plans Examiner Mark Masek at ph# 520-837-4994, mark.masek@tucsonaz.gov or contact Building_Official@tucsonaz.gov TC-COM-0124-00210 Electrical equipment foundations and pipe supports | |
| TC-CFO-1124-00231 | Issued | 11/21/2024 | 07/21/2025 | Certificate of Occupancy | Electrical equipment foundations and pipe supports |