Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0124-00189
Parcel: 128010530

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0124-00189
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/27/2024 Site Engineering APPROVED
03/05/2024 Water - PDSD APPROVED
03/05/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
02/15/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 2/14/2024 2:36:04 PM

1. GENERAL - ENGINEERED DRAWINGS: Architectural Drawings A003, A003.2 & A004 include the statement: "SiteSpecific Footing Engineering Required by Licensed Engineer" and "Site Specific Footing Engineering per Structural Sheets". In addition, Sheet A006 includes a callout for "6" Galvanized Steel Tube Post (See Structural)". Please indicate where this information has been provided. Engineered drawings should indicate the design loads and assumptions for wind design and allowable soil bearing pressure.



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 2/7/2024 6:33:17 PM




Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 2/12/2024 9:56:16 PM



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved with Comments
Reason:
Date Completed : 2/10/2024 2:06:48 PM
Electrical Review of Starbucks
By: Ron Ross PE
E503 ELECTRICAL DETAILS: Minimum Wire and Conduit schedule should have been more clearly identified and referenced by Panel schedules and other locations.


Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 2/15/2024 1:21:58 AM
First Plumbing Review:

1). Each restroom will need a lavatory in the same room as the toilet. The required lavatories can't be located in a common space outside of the restrooms. -2018 IPC 405.3.2 ( Update all affected plan pages throughout plan set)

2). The ice machine on plan pages P102 & P601 Can't connect to the grease system. -2018 IPC 1003.2

3). Add the existing grease interceptor manufacture name, model # & sizing calculations to plan page P102 or P601 -2018 IPC Tucson Plbg code amendments.

4). If the existing grease interceptor is an Hydromechanical type it can not receive discharge from more than 4 items and or a dishwasher. -2018 IPC Tucson Plbg Code Amendments.

5). The Plumbing Or mechanical plans need to illustrate the Gas water heater exhaust & Combustion air methods. -2018 IFGC 304, 503.1

6). Plan P601 fixture schedule needs to include manufacturer names & model numbers , including the water heater as well. - 2018 IPC 303, 501.5

7). Plan Page P001 needs to include all piping materials to be used -2018 IPC 605.4, 702, IFGC 403.1
02/16/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review

PROJECT: TC-COM-0124-00189
6210 E. Broadway Bl. - C-1
Food Service (1st Review)

TRANSMITTAL: February 16, 2024

Please resubmit revised drawings and any redlined plans along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

This site is located in C-1 zone (UDC 4.7.20), Food Service: Excluding Soup Kitchens is an allowed use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.4.M.1 & 5 and 4.9.13.O.

1. Sheet A001 Architectural Site Plan and sheet A001.1 Enlarged Site Plan the location of the accessible vehicle parking spaces shown do not match what is shown in the approved DP. Either the building plan or the DP will need to be revised so that the plans match.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
02/26/2024 Fire New Construction REVIEW COMPLETED
01/31/2024 PDSD Application Completeness REVIEW COMPLETED