Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0124-00189
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/10/2024 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
05/10/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 3/29/2024 6:24:31 PM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/7/2024 6:33:17 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 2/12/2024 9:56:16 PM Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 2/10/2024 2:06:48 PM Electrical Review of Starbucks By: Ron Ross PE E503 ELECTRICAL DETAILS: Minimum Wire and Conduit schedule should have been more clearly identified and referenced by Panel schedules and other locations Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 5/2/2024 7:10:46 PM Plumbing Review: OK Resolved-1). Each restroom will need a lavatory in the same room as the toilet. The required lavatories can't be located in a common space outside of the restrooms. -2018 IPC 405.3.2 ( Update all affected plan pages throughout plan set) Resolved-2). The ice machine on plan pages P102 & P601 Can't connect to the grease system. -2018 IPC 1003.2 Resolved-3). Add the existing grease interceptor manufacture name, model # & sizing calculations to plan page P102 or P601 -2018 IPC Tucson Plbg code amendments. Resolved-4). If the existing grease interceptor is an Hydromechanical type it can not receive discharge from more than 4 items and or a dishwasher. -2018 IPC Tucson Plbg Code Amendments ** ALLOWED PER UTILILITY AUTHORTY SEE RESPONSE COMMENTS EMAIL FROM PIMA" Resolved-5).Plan Sheet M101: The Plumbing Or mechanical plans need to illustrate the Gas water heater exhaust & Combustion air methods. -2018 IFGC 304, 503.1 **The Combustion Air method is still missing from plan page M101 , add the combustion air method in accordance with -2018 IFGC 304** Resolved-6). Plan P601 fixture schedule needs to include manufacturer names & model numbers , including the water heater as well. -2018 IPC 303, 501.5 Resolved-7). Plan Page P001 needs to include all piping materials to be used -2018 IPC 605.4, 702, IFGC 403.1 Resolved-8). Plan Sheet P102: The newly added fixture schedule water heater model number correlates to an electric water heater ,the plumbing plans show gas being piped to the water heater? Update the plumbing plans to correlate with the selected appliances. -2018 IPC 106.3.1** |
||
04/29/2024 | PDSD Application Completeness | REVIEW COMPLETED |