Permit Number: TC-COM-0124-00162
Parcel: 12904138A

Address:
24 N NORRIS AV

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0124-00162
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
08/19/2026 Commercial Electrical Standard APPROVED Electrical (E) Reviewer
Ron Ross; rross@safebuilt.com
Discipline Status:Approved with Comments
Date Completed: 8/18/2026
1.E5.1 ONE-LINE DIAGRAM & CALCULATIONS: Confirm that RFP allows for distribution board to be a Fused
Distribution Board (as shown by One-Line). Need to consider typical circuit breaker distribution board for better MTBF
due to circuit overloads (such as potential issue with Panel F) and availability. This is a Fire Station where a fuse
blown could easily cause downtime during a critical event. A fuse will need to be replaced vs a circuit breaker could
be reset immediately after the fault is cleared. Fuses require replacements that may or may not be readily available.
2.E5.2 PANEL SCHEDULES AND DETAILS: Should upsize Panel F as Demand on phase A is 199.65A and fuse
protection is rated for 200A. Current fuse and panel size provides no capacity for any additional circuits on phase A.
08/25/2026 Site Engineering APPROVED
08/25/2026 Site Zoning APPROVED
08/25/2026 Bldg Permits - Post Review Express PENDING ASSIGNMENT
08/19/2026 Commercial Building Standard REQUIRES RESUBMIT Building (B) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Denied
Date Completed: 8/18/2026
1.Sheet A0.2-1:The fitness area is missing the occupant load calculation. Provide a occupant load calculation for the
fitness area in accordance with 2018 IBC Table 1004.5UNADDRESSED



Structural (S) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Denied
Date Completed: 8/18/2026
1.GENERAL - UPDATES: For project updates, please submit sheets with all changes clearly marked in revision clouds.
Please provide a written response to each comment; updates without a clear response to all comments may not be
reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in
additional comments.UNADDRESSED
2.GENERAL - SPECIAL INSPECTIONS: Please have the Registered Design Professional in Responsible Charge of this
project complete and return the City of Tucson Special Inspections Certificate with signatures. The form can be
downloaded at:https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-development-
services/documents/special_inspection_certificate.pdfUNADDRESSED
3.GENERAL - GEOTECHNICAL REPORT: Please provide a copy of the site-specific geotechnical report referenced in
the structural general notes. The report should support the appropriateness of the selected foundation system for the
project site. All building code references must be updated to the current code adopted by the City.UNADDRESSED
4.S0.1 - CURRENT CODE: The currently adopted building code for the City of Tucson is the 2018 International Building
Code and its auxiliary codes. Please update the seismic design portion of the structural general notes to comply with
this code, including the 2016 version of ASCE 7.UNADDRESSED
5.S0.1 - CONFIRM DESIGN: Please confirm the typical fasteners called out under "Steel Roof Deck" and "Steel Floor
Deck" on Sheet S0.1. The general notes state that the floor diaphragm shall be designed for a higher diaphragm shear
capacity than the roof diaphragm. However, the fasteners called out are the same or are placed at a larger spacing
than the typical roof diaphragm fasteners. Please confirm that this was the engineer's intent and that the fasteners
indicated for the floor diaphragm are sufficient to resist the shear imposed by wind and seismic events.
UNADDRESSED
6.S1.0 - COLUMN SCHEDULE: Notes on the Column Schedule refer to Detail 70 for base plate information at Column
Types "C5" and "C8". However, Detail 70 Note 2 calls for "screw anchors per column schedule". Please provide
information on how the base plates are fastened for these two column types.UNADDRESSED
7.S1.1 - MISSING INFORMATION: Foundation plan notes 4 & 5 on S1.1 indicate the typical thickness of two types of
slab-on-grade. Please indicate how these slabs are reinforced, keeping in mind the recommendations for the minimum
area of steel recommended to resist temperature and shrinkage cracking on ACI 318-14, Table
24.4.3.2.UNADDRESSED
8.S2.1 - CONFIRM DESIGN: Please refer to the Low Roof/2nd Floor Framing Plan, at the slab step separating the
indoor dining area from the west balcony. The plan shows a steel beam type "B21" (W24x207) out of plane of the cold-
formed steel wall, as shown in Section Cut 251. Because this beam is not directly below the wall, it is also not aligned
with Steel Columns "C8" and "C5", carrying roof loads above. Please confirm that this is acceptable, and the slab
directly below these columns has been designed for punching shear.UNADDRESSED
9.S2.1 - CONFIRM DESIGN: Please refer to the Low Roof Plan/2nd Floor Framing Plan, Grid A between Grids 3 & 4.
The low roof is framed with "stub beams", cantilevered off Grid A via multiple beam-to-beam moment connections.
Detail 251 is cut on plan to describe this connection, however, it does not capture the moment connection, nor the
interior B3 beams spanning between Grids A and B, which appear to be vertically offset by a maximum of 6" (Ref
Detail 251). Please provide a new detail that shows clearly how this cantilevered low roof is being
framed.UNADDRESSED
10.S2.1 - CONFLICTING INFORMATION: Section Cut S268 cut at the southwest corner of the Low Roof Framing Plan
indicates a steel channel (Plan Note 10) that does not appear on plan. Framing Plan calls out beam type "B6"
(W12x14) at this location. Please confirm that this is acceptable and revise the detail accordingly.UNADDRESSED
11.S2.1 - MISSING DETAIL: Framing Plan S2.1 includes Section Cuts 283, which do not appear on detail sheet S6.5.
Please provide the missing detail or correct the section cuts.UNADDRESSED
12.S3.1 - MISSING BEAM SIZES: Please provide beam sizes for canopy overhang shown on the southwest corner of the
building. Where shown on the section cuts, please provide CFS stud and joist size and spacing. Refer to Details 259,
264 and 267 for more information.UNADDRESSED
13.S3.1 - CONFLICTING INFORMATION: Please refer to the High Roof Framing Plan, east elevation. The headers
shown currently do not match the window pattern shown in Architectural Elevation 3/A9.1. Please confirm the final
window layout and resubmit plans.UNADDRESSED
14.S3.1 - Refer to Roof Plan 1/S3.1, Grid C/5. Section 263 is called out to describe the roof deck overhanging Beam "B7".
Detail 263 calls out a maximum overhang of 10", which is exceeded at this location. Please confirm that this is
acceptable.UNADDRESSED
15.S3.1 - MISSING INFORMATION: Roof Plan 1/S3.1 shows a non-load bearing infill wall below the high-roof framing
above marked with Plan Note "38". Please provide Plan Note 38 for clarity.UNADDRESSED
16.S3.1 - MISSING DETAIL: The High Roof Framing Plan includes a section cut for Detail 274, which does not existing
on Sheet S6.4. Please either provide the missing detail or revise the section cut.UNADDRESSED
17.S4.1 - CONFIRM DESIGN: Review Detail 18. By inspection, an HSS2x2x1/4 post at 8'-0" oc maximum does not
appear to be able to resist lateral loads from wind as prescribed in structural general notes. Please provide
calculations to substantiate this post size. In addition, please provide footing reinforcement where it is currently
unlabeled.UNADDRESSED
18.S5.2 - CONFLICTING INFORMATION: Details 121, 126 & 127 provide conflicting information for the thickness of the
concrete mat footing below the elevator pit. Please confirm if the footing shall be 12" or 20" thick and
resubmit.UNADDRESSED
19.S6.1 - MISSING INFORMATION: Detail 214, Note 2 refers to the beam schedule on Sheet S1.0 for information on
typical bundled CFS studs supporting steel beams. The beam schedule does not provide this information. Please
clarify where this information can be found.UNADDRESSED
20.S6.3 - CONFIRM DESIGN: Detail 254 shows a steel beam mounted on an embed plate within a CMU wall. This detail
includes horizontal slotted holes and a greased bearing seat to allow for movement of the beam. However, it also
includes a welded connection to a vertical embed plate. Please confirm that this is acceptable, and it is the engineer's
intent that the beam will be restricted from movement out of plane of the wall.UNADDRESSED
21.S6.4 - CONFIRM DESIGN: Detail 275 is titled "Steel Drag Beam at Masonry Wall End/Corner", and shows a steel
beam mounted on an embed plate within a CMU wall. This detail includes horizontal slotted holes and a greased
bearing seat to allow for movement of the beam. Please confirm that this was the design intent, and that the beam is
not intended to transfer ("drag") diaphragm forces into the CMU wall.UNADDRESSED
22.S6.4 - MISSING INFORMATION: Details 267 & 268, called out at the southwest corner of the building, do not provide
sizes for the cold-formed steel stud size, joist size or spacing. Please information where this information has been
provided.UNADDRESSED
23.STRUCTURAL CALCULATIONS: Due to the complexity of this project, please provide with the following structural
calculations at each level: The floor maps noting all of the beam member sizes, the floor maps noting all surface loads
considered, and the beam summary sheets noting that all beams have passed the analysis.UNADDRESSED
08/19/2026 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical (M) Reviewer
Jorge Valido; jvalido@safebuilt.com
Discipline Status:Denied
Date Completed: 8/19/2026
1.(UNRESOLVED) - Plan Sheet M2.1-2 -(2) SAD (Supply Air Drop) coming from AC-5 in Corridor not identified. Provide
type of grill and CFM quantities. - 2018 IBC Section [A]107.2.1Information on construction documents.
◦No corrections made. No Narrative letter provided.
2.(UNRESOLVED) - Plan Sheet M2.1 -AC-2 Supply main trunk line not drawn in on plan sheet. Include Main Supply Air
Trunk line on plans and connect all associated SAD (Supply Air Drops) to trunk line - 2018 IBC Section
[A]107.2.1Information on construction documents.
◦Correction not made
3.(UNRESOLVED) - General- Provide Air Balance Schedule. Show air balance for Kitchen Hood. Show where the
Makeup Air for Grease Hood is coming from. - 2018 IMC Section 508.1.2
◦Air Balance schedule not provided
4.(UNRESOLVED) -HP 1 shows onPlan Sheet M3.1on the RTU HP Schedule 800 CFM of total Supply air.Plan Sheet
M2.2shows for HP1, (2) RG3 at 800 CFM each and does not provide SAD (Supply Air Drop) CFM quantities. Confirm
all CFM quantities - 2018 IBC Section [A]107.2.1Information on construction documents.
◦No corrections made
5.(UNRESOLVED) - Plan Sheet M2.1-2- SAD (Supply Air Drops) inside of Bath 1 thru 4 (4) in total) do not have CFM
Quantities. - 2018 IBC Section [A]107.2.1Information on construction documents.
◦No corrections made
08/19/2026 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing (P) Reviewer
Andrew Bevis; abevis@safebuilt.com
Discipline Status:Denied
Date Completed: 8/18/2026
1.Trench Drain system Bldg drain on plan page P4.0 needs 1 vent to the exterior. -2018 IPC 904.1, 901.2.1
UNADDRESSED
2.Clothes washer boxes on plan pages P2.1, P2.1-2,P4.0, P5.0 need to discharge thru an Lint interceptor -2018 IPC
1003.6UNADDRESSED
3.Sump pump detail on plan page P3.1 needs to include a shut off valve on the discharge side of the check valve piping
-2018 IPC 712.2UNADDRESSED
4.The roof drainage method for the apparatus bay roof on plan page A8.1 isn't clear? -2018 IPC 1101.2
UNADDRESSED
5.The Roof decks on plan page P2.1 need secondary drains -2018 IPC 1108UNADDRESSED
6.Plan page P2.1 needs to include the GPM the 2" deck drains will be responsible for. -2018 IPC 1106.2
UNADDRESSED
7.BBQ grills below covered roof on plan page P2.1-2 need to have an exhaust hood above-2018 IFGC 623.1, 623.5
UNADDRESSED
08/17/2026 PDSD Application Completeness Express REVIEW COMPLETED