Permit Number: TC-COM-0124-00106
Parcel: 14041124E

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0124-00106
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/30/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
01/30/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1. Provide a complete electrical site plan showing the locations of all the New Electrical service(s) and existing electrical service(s) including the relocated service, before and after.

2. Per the Permit description, “East electrical service relocate”. Define “East electrical service”. Is this ‘SES-2A’ ?

3. Provide detailed information as to the scope of work associated with ‘SES-2A’, Downstream panels and transformers. Are these all new?

4. (a) New load centers ‘HP2’, ‘NH3’, ‘NH4’, ‘EH3’ Lighting inverter, ‘EH4’ Lighting Inverter, all show Lighting loads. Is the lighting and Lighting Controls existing or new? Please provide a Lighting floor plan and identify the Lighting if applicable.

(b) Provide complete compliance with the 2018 IECC and 2012 City of Tucson Outdoor Lighting Code if applicable.

5. Ref; Line diagram for SES-2A.

(a) Verify that the main Circuit Breakers rated at 1000 amps are Ground Fault equipped, NEC 240.13, 230.95.

(b) Provide a detailed scope of work associated with the Fire Pump. Show how the Fire Pump feeder is installed inside or outside the building. Verify compliance with NEC 695.6(A)(1), (2), and (3).

6. Provide for a common Grounding Electrode System for all electrical services located at Building 2, NEC 250.58.

7. Ref; Electrical Line Diagram for SES-2B.

(a) There are no load calculations for this electrical service. How is the load calculation derived at 3121 amps?

(b) What are all the load circuit breakers connected to? If future loads by separate permit, please indicate with a note on the plan.

Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC, 2012 City of Tucson Outdoor Lighting Code.
01/17/2024 PDSD Application Completeness REVIEW COMPLETED