Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0124-00041
Parcel: 12509012A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0124-00041
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/05/2024 Site Engineering APPROVED
01/11/2024 Site Zoning APPROVED
02/05/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
01/22/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/22/2024 10:44:37 AM
1. Sheets A1.0 Detail 1, A3.0, M1.0: The wall and ceiling section details and mechanical drawings specify that the ceiling is an acoustical ceiling grid but is show differently in the room finish schedule and on sheet A3.0. Please coordinate
and correct the design details. (2018 IBC section 107)



Building(B) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/22/2024 10:42:33 AM
1. Sheet G1.0: Provide the kitchen equipment specification sheets at this time to determine if a hood is required for the cooking equipment. Cannot be included in the deferred submittals. (2018 IBC section 107)

2. Sheet G1.0: Include the standing area occupant load in the calculations for the ordering and waiting areas. (2018 IBC section 1004, Table 1004.5)

3. Sheet A1.0: Show the accessible dining/seating space and include the space dimensions and dining surface height. (2009 ICC A117.1 sections 1108.2.9.1)

4. Sheets A1.0, A1.1: Show the dimensions of the maneuvering clearance on the pull side of the door. A minimum of 18” unobstructed space is required on the latch side of the door. (2009 ICC A117.1 section 404.2.3.5 Figure (a))

5. Sheet M1.0: Include the walk-in cooler construction, equipment, and specifications. Show compliance with the energy code requirements. (2018 IECC Section C403.10, 2018 IMC section 106.3.1)



Mechanical(M) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/22/2024 10:43:32 AM
1. Sheets G1.0, A1.0, A2.0, M1.0: The conveyor oven shown on sheet A1.0 is not included on the kitchen equipment schedule. Please provide the kitchen equipment specification sheets at this time to determine if a hood is required for the cooking equipment. Cannot be included in the deferred submittals. (2018 IBC section 107, 2018 IMC sections 106.3.1, 506, 507)

2. Sheet M1.0: There are two toilet room exhaust fans. Provide the correct air balancing calculations and include the toilet room exhaust fan and duct details. (2018 IMC section 403.1)

3. Sheet M1.0: Include the walk-in cooler construction, equipment, and specifications. (2018 IMC section 106.3.1)



Electrical(E) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/22/2024 10:43:02 AM
1. Sheet E1.0: Clarify the note specifying that the hood control panel is above the kitchen sink. (2018 IBC section 107)

2. Sheet E1.0: Show the location of the service and subpanel equipment. (2018 IBC section 107)

3. Sheet E1.0: Missing a GFCI protected service receptacle for the roof top HVAC equipment. (2017 NEC sections 210.63, 210.8)

4. Sheet E1.0: Power circuits to the toilet room exhaust fans are not shown. (2018 IBC section 107)



Plumbing(P) Reviewer
Keith Miller
kmiller@safebuilt.com
Denied
Reason:
Date Completed : 1/22/2024 10:44:03 AM
1. Sheets P1.0, P2.0: Include the location, specifications, and calculations for the grease interceptor on the floor plan piping layout and the isometric diagrams. (2018 IPC section 1003, Amended sections 1003.3)

2. Sheets P1.0, P2.0: The hand wash sinks are required to be be connected to the grease interceptor or post a sign stating “HANDWASH SINK ONLY! NO FOOD PREPARATION OR DISHWASHING ALLOWED.” (2018 IPC amended section 1003.3)

3. Sheet P1.0: Include the faucet details meeting the requirements of the 2018 IPC amended sections 412.11 and 419.6.

4. Sheet P2.0: Include the water supply piping isometric. (2018 IBC section 107)
01/19/2024 Fire New Construction REVIEW COMPLETED
01/09/2024 PDSD Application Completeness REVIEW COMPLETED