Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
2575 E BROADWAY BL
Apply Date:
01/08/2024
Applicant:
alex enoch
Description:
new sub shop in existing shell

Permit Reviews

Permit Number - TC-COM-0124-00041
Permit Status: Complete
Permit Description: new sub shop in existing shell
Start Date Submittal Complete Date Status  
06/27/2024 RESTAMP - COMMERCIAL v.1 07/01/2024 APPROVED Review Details
06/26/2024 COMMERCIAL REVIEW - FULL v.3 06/27/2024 APPROVED Review Details
06/25/2024 COMMERCIAL REVIEW - FULL v.2 06/26/2024 REQUIRES RESUBMIT Review Details
01/09/2024 COMMERCIAL REVIEW - FULL v.1 02/05/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0124-00041
Permit Status: Complete
Permit Description: new sub shop in existing shell
Date Description Comments
01/09/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00041
Permite Description: new sub shop in existing shell
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/15/2025 COT - BULD - SWG Clearance N/A Not Applicable
COT - FCON - Hood System - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0124-00041
Permit Description: new sub shop in existing shell
Total Completed Inspections - 16
Date Description Inspector Results Comments
07/24/2024 COT - HCPL - Rough Soil Passed Ok to cover progress areas.
09/09/2024 COT - HCBU - Framing Passed
10/22/2024 COT - HCPL - Plumbing Intermediate Passed
10/23/2024 COT - HCEL - Electrical Intermediate Passed Ok to insulate and cover walls.
11/08/2024 COT - HCME - Venting Passed Smoke test for kitchen hood. Ok to wrap duct and install hood.
04/15/2025 BULD - Electrical Clearance Passed
04/15/2025 ENGR Engineering Final Passed Site is good.
04/15/2025 COT - HCBU - Preslab Passed
04/15/2025 COT - HCEL - Electrical Final Passed
04/15/2025 COT - HCME - Mechanical Final Passed
04/15/2025 COT - HCME - Mechanical Intermediate Passed
04/15/2025 COT - HCPL - Plumbing Final Passed
04/18/2025 COT - FCON - Hood System - Final Passed
04/18/2025 COT - FCON - Fire - Final Passed
04/21/2025 TRSP - ROW - Final/Close-Out Passed
04/21/2025 COT - HCBU - Building Final Passed