Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0124-00027
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/08/2024 | Site Zoning | APPROVED | |||
01/08/2024 | Fire New Construction | NOT REQUIRED | |||
01/31/2024 | Site Engineering | NOT REQUIRED | |||
02/02/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
02/01/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1.Ref; Plan sheet E-1. Provide more detail for the lighting being replaced. (a) Provide a luminaire schedule. (b) Indicate wiring methods for the emergency lighting. Verify compliance with NEC art 700.12, 700.12(F)(2)(4), 408.4, 700.16. Ref; 2018 IBC section 107.2.1, 2017 NEC |
||
02/01/2024 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Replacement of commercial AC units constitutes new work so the submittal will require a heating/cooling load calculation to justify the capacities of the units being installed (Sections C403.3.1 and C403.2.2, IECC 2018). The units themselves will also have to comply with Sections C403.3.2, C403.4 and C403.5, IECC 2018 for efficiency, controls, and economizers. Reference: Section C503.4, IECC 2018. 2. Revise the ventilation calculations using Table 403.3.1.1.2.3.2 and Equation 4-8, IMC 2018, to include the system ventilation efficiency. Reference: Sections 403.3.1.1.2.3, IMC 2018. |
||
02/02/2024 | Commercial Structural | REQUIRES RESUBMIT | Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. 1. Submit a New Roof Plan showing and specifying the new roof covering, the location of the HVAC equipment replacement and associated equipment and parts and any other equipment that will be installed on the roof. 2. Provide detail drawings as to the valley flashing or any flashing used will be installed, materials being used, fastening type used, etc 3. Please resubmit. |
||
01/05/2024 | PDSD Application Completeness | REVIEW COMPLETED |