Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0123-00423
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/31/2023 | Site Zoning | APPROVED | |||
01/26/2023 | Site Engineering | NOT REQUIRED | |||
01/31/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
01/27/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0123-00423 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Conditionally Approved Building review is hereby approved with the following stipulations: 1. Complete City of Tucson Building Department Special Inspection Certificate as follows: ◦ Part A to indicate name and license number of construction contractor; ◦ Part A must complete owner or legal agent signature; ◦ Part B - Engineer of record (EOR), must meet all requirements as stated in the City of Tucson 2018 IBC, Section 1703 - 1703.6.2. ◦ Part C to be completed prior to issuance of occupancy certificate. 2. Verification & Inspection of Concrete Construction on page S001 shall no longer refer to Section 1912.1 under concrete-filled pipe columns (2015 IBC), but to Section 1901.3 (2018 IBC, enforced by the City of Tucson 1/2/2019). Anchoring to Concrete shall be in accordance with manufacturer requirements and ACI 318 as amended in Section 1905, and applies to cast-in (headed bolts, headed studs and hooked J- or L-bolts), post-installed expansion (torquecontrolled and displacement-controlled), undercut and adhesive anchors. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Denied E101 FIRST FLOOR ELECTRICAL DEMO AND POWER PLAN: Could not locate Keynote 8. E801 ONE-LINE DIAGRAM & PANEL SCHEDULES: New Dist Panel L#C-151 has 400 amp bus with 600 amp CB. Probably not available. 600 Amp CB is oversized for existing feeder (or show feeder size for reviewer). Resize as required. Should estimate current load for existing circuits. Should not leave as 0 unless there is no load on these branches. Calculated loading for L3C-152 is in error. Use 277V to neutral, not 480V. Also missing loads of CT Scan Rm 1126 and Radiation Rm 1125 (may be intermittent and not needed, EOR decision). PLUMBING REVIEW COMMENTS: Conditionally Approved First Plumbing Review: Ok Subject to Field Inspections If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
01/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
01/10/2023 | PDSD Application Completeness | REVIEW COMPLETED |