Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM07932
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/28/2023 | Site Engineering | APPROVED | |||
10/04/2023 | Site Zoning | APPROVED | |||
10/04/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/21/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 9/14/2023 4:01:11 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/14/2023 10:00:41 AM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Denied Reason: Date Completed : 9/17/2023 12:45:16 AM 1. Provide manufacturers hood specs or if shop made Provide ventilation requirements for shop made hood (e.g type of filters, type of construction of hood, capacity of hood etc) (IMC2018,106.3.1 & 507.1) 2. Provide section and plan view's of appliances under hood to determine overhang requirements (MMC2018,106.3.1) 3. Provide kitchen equipment list (IMC2018,106.3.1) 4. Provide isometric gas pipe riser plan showing the 1. furthest gas run from the meter to the furthest appliance 2. the total gas load in cfh 3. the gas inlet pressure and 4. the pressure drop and 5. the table in the IFGC used to size the gas pipe sheet M2.1 (IFGC2018,106.3.1) 5. Show how you are complying with the Commercial energy code (software like Comcheck is acceptable) IMC2018,101.5 &101.5.1) Electrical(E) Reviewer Ron Ross rross@safebuilt.com Conditionally Approved Reason: Date Completed : 9/18/2023 9:20:23 AM Electrical Review of QT Canopy By: Ron Ross PE Approved with the comments below that can be addressed in final inspection. E610: a. Sheet still shows Panel T as NEMA 3R. d. Did not show, and one circuit conflicts with b Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 9/20/2023 11:33:42 PM Revised plumbing Plan review=Ok Subject to field inspections |
||
09/26/2023 | Fire New Construction | REVIEW COMPLETED | Separate permits required for installation of: *fire alarm *CO2 gas detection alarm *alarm monitoring *hood suppression system *flammable/combustible liquids for fuel tank installation. |
||
09/12/2023 | PDSD Application Completeness | REVIEW COMPLETED |