Permit Number: T22CM07932
Parcel: 14036017C

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - T22CM07932
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/04/2023 External Reviewers - SAFEBuilt APPROVED Activity Number: T22CM07932/CONVENIENT STORE AND T22CM07933/FUEL CANOPY

GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.


BUILDING REVIEW COMMENTS:
Approved


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E001: Could not locate Keyed Note #14
E004: No plan notes actually on the sheet.
E005: No security shown. Not needed for electrical permit.
E104: Could not locate Plan Note #4.
E602: May need to upsize conductors for item 217 as it is probably a continuous load.


PLUMBING REVIEW COMMENTS:
Conditionally Approved
Third Plumbing Review:=OK Subject to Field Inspections
1). OK-restroom Lavatory fixture spacing/separation measurements still not shown on A214=Subject to Field Inspections
2). OK
3).OK
4).OK- Per response there isn't any discharge over 140 deg. =Subject to Field Inspections
5). OK
6). OK - Per response Canopy run-off is secondary drain
7). OK
8). OK- Piping Materials subject to to Field inspections " Spec Manual not provided*


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
04/19/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
04/14/2023 Site Engineering REQUIRES RESUBMIT The permit cannot be approved until its associated development package, DP22-0074, has been approved.

Lianne Evans
lianne.evans@tucsonaz.gov
04/19/2023 Site Zoning REQUIRES RESUBMIT CDRC Transmittal

FROM: Zoning Review Section

PROJECT: T22CM07932
QuickTrip No 1499 (3rd review)
New General Merchandise – Convenience Store

TRANSMITTAL DATE: April 19, 2023

DUE DATE: April 20, 2023

COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.

01. COMMENT: Zoning has done a cursory review of the building plans and although the site plan appears to match the associated development package, zoning cannot approve the building plans until DP22-0074 has been approved and the building plans have been reviewed for consistency.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
03/21/2023 PDSD Application Completeness REVIEW COMPLETED