Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - T22CM07932
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM07932/CONVENIENT STORE AND T22CM07933/FUEL CANOPY GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E001: Could not locate Keyed Note #14 E004: No plan notes actually on the sheet. E005: No security shown. Not needed for electrical permit. E104: Could not locate Plan Note #4. E602: May need to upsize conductors for item 217 as it is probably a continuous load. PLUMBING REVIEW COMMENTS: Conditionally Approved Third Plumbing Review:=OK Subject to Field Inspections 1). OK-restroom Lavatory fixture spacing/separation measurements still not shown on A214=Subject to Field Inspections 2). OK 3).OK 4).OK- Per response there isn't any discharge over 140 deg. =Subject to Field Inspections 5). OK 6). OK - Per response Canopy run-off is secondary drain 7). OK 8). OK- Piping Materials subject to to Field inspections " Spec Manual not provided* If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
04/19/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
04/14/2023 | Site Engineering | REQUIRES RESUBMIT | The permit cannot be approved until its associated development package, DP22-0074, has been approved. Lianne Evans lianne.evans@tucsonaz.gov |
||
04/19/2023 | Site Zoning | REQUIRES RESUBMIT | CDRC Transmittal FROM: Zoning Review Section PROJECT: T22CM07932 QuickTrip No 1499 (3rd review) New General Merchandise – Convenience Store TRANSMITTAL DATE: April 19, 2023 DUE DATE: April 20, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. 01. COMMENT: Zoning has done a cursory review of the building plans and although the site plan appears to match the associated development package, zoning cannot approve the building plans until DP22-0074 has been approved and the building plans have been reviewed for consistency. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
03/21/2023 | PDSD Application Completeness | REVIEW COMPLETED |