Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM07577
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/31/2022 | External Reviewers - SAFEBuilt | APPROVED | |||
| 11/09/2022 | Fire New Construction | APPROVED | |||
| 11/17/2022 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/17/2022 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide the civil site plans referenced on sheets A-001 and P-201, showing the construction of the building sewer from the building drain to the connection to the public sewer and the construction of the water service from the water meter to the building connection. Reference: Section 107.2.1, IBC 2018. 2. Interior waste piping upstream of the grease interceptor shall have a minimum slope of ¼” per foot (2% slope). Reference: Section 704.1, IPC 2018. 3. The maximum distance between cleanouts shall be 100-feet, measured along the developed pipe length from the upstream entrance of the cleanout (see sheet note F, P-201). Reference: Section 708.1.1, IPC 2018. |
||
| 10/31/2022 | Site Engineering | REQUIRES RESUBMIT | his permit cannot be approved until its associated development package has been reviewed and approved. Lianne Evans lianne.evans@tucsonaz.gov 520-837-5341 |
||
| 10/31/2022 | Site Zoning | REQUIRES RESUBMIT |