Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - T22CM07302
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/28/2023 | Commercial Plumbing | APPROVED | |||
| 02/21/2023 | Commercial Structural | APPROVED | |||
| 03/14/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/14/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Multifamily dwellings are considered commercial therefore all Electrical Code references need to be per 2017 NEC. Remove IRC Code references and revise to NEC. 2 Provide more detail as to the extent and scope of electrical work required for each unit. If the units are being re-wired, indicate designated branch circuits and provide complete panel schedules identifying all branch circuits for all devices and Mechanical/Plumbing equipment. NEC 408.4. 3 What is existing to remain and what is new? 4 Where are the breaker panels located? If in the bathroom or clothes closet, relocate panel to a code compliant location. NEC 240.24(D)(E), 408.17. 5 Provide for Tamper Resistant receptacles for replacements. NEC 406.12. 6 Verify Outdoor Lighting Code Compliance for the exterior lighting. 7 Provide for GFI protected exterior receptacles. 8 Are the rooftop AC units new? Show location on the electrical plans and verify that there is a 120v WP/CFI receptacle on the roof for Mechanical equipment Maintenance. NEC 210. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2012 City of Tucson Outdoor Lighting Code. |
||
| 02/28/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Comment not addressed. [Initial comment: The mechanical notes still call out sections of the IRC but refer to them as IBC sections (e.g. the first note calls for the ductwork to comply with the 2018 IBC Chapter 16, but Chapter 16 of the 2018 IBC is Structural requirements, not ductwork). See also, the 2018 IMC and the 2018 IECC.] 2. Comment not addressed. [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section R403, IECC 2018.] |
||
| 02/16/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |