Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.5
Permit Number - T22CM07302
Review Name: COMMERCIAL REVIEW - FULL v.5
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/25/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/24/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. This is the 5th electrical review (VERSION 5). The plan reviewer copied the previous electrical comments (VERSION4) with an explanation of what information was deficient with the re-submittal. The current re-submittal (version 5) still does not address the electrical comments. Provide electrical design and calculations performed by an Electrical Engineer registered in the State of Arizona who has demonstrated proficiency through registration, technical knowledge, or experience to perform such work. Provide complete electrical plans sealed by the EE. Reference: Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. Ref; 2018 IBC section 107.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements |
||
| 05/25/2023 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Comment not addressed. [Third comment: Comment not addressed.] [Second comment: Comment not addressed.] [Initial comment: The mechanical notes still call out sections of the IRC but refer to them as IBC sections (e.g. the first note calls for the ductwork to comply with the 2018 IBC Chapter 16, but Chapter 16 of the 2018 IBC is Structural requirements, not ductwork). See also, the 2018 IMC and the 2018 IECC.] 2. Revise the heating/cooling load calculations to apply to the three dwelling units in this activity. [Third comment: Section R403.7, IECC 2018 is a mandatory requirement to calculate the heating and cooling loads using “ACCA Manual J or other approved heating and cooling calculation methodologies.” The Titan HVAC Load Calculator is not an approved calculation method. [Second comment: Comment not addressed.] [Initial comment: Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section R403, IECC 2018.] |
||
| 05/08/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |