Permit Number: T22CM07302
Parcel: 10513098B

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - T22CM07302
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/27/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
01/03/2023 Commercial Electrical REQUIRES RESUBMIT Plans are not legible, especially when trying to zoom in.
Please use a better format and re-submit.
Ref 2018 IBC section 107.2, 2017 NEC, 2018 IECC, 2012 Tucson Outdoor Lighting Code, City of Tucson Commercial Plan Submittal Requirements.
01/24/2023 Commercial Mechanical REQUIRES RESUBMIT 1. The new raster scan drawings are illegible: submit legible drawings.
2. The mechanical notes still call out sections of the IRC but refer to them as IBC sections (e.g. the first note calls for the ductwork to comply with the 2018 IBC Chapter 16, but Chapter 16 of the 2018 IBC is Structural requirements, not ductwork). See also, the 2018 IMC and the 2018 IECC.
3. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section R403, IECC 2018.
4. The current Federal minimum energy efficiency for small package units (i.e. rooftop heat pumps) is 14.0 SEER, not 13 SEER.
01/24/2023 Commercial Plumbing REQUIRES RESUBMIT 1. The new raster scan drawings are illegible: submit legible drawings.
2. The plumbing notes still call out sections of the IRC but refer to them as IBC sections (e.g. the first note refers to “2018 IBC Chapter 25 thru Chapter 33.” but the 2018 IPC only has 15 chapters). [Initial comment: The International Plumbing Code, 2018, and the International Fuel Gas Code, 2018is the controlling code for this structure, not the International Residential Code. Reference: Section 101.2, IPC 2018.]
3. Total demand is 36.8 GPM which exceeds the allowable demand of 20 GPM for a 5/8” water meter and 30 GPM for a ¾” water meter. A 1” meter will be required. The size of the proposed backflow prevention assembly is also undersized. [Initial comment: Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
4. Provide a thermal expansion tank and the termination point of the pressure relief. [Initial comment: Provide a detail of the water heater installation, including the excess pressure relief, expansion tank, vacuum relief or other anti-siphon device, safety pan, and valves. Reference: Sections 503.1 , 504, 606.1, and 607.3, IPC 2018.]
5. The PEX branch tube sizing chart has not been submitted. [Initial comment: For the use of PEX tubing, provide a branch tube sizing chart showing the correct size of PEX tubing to be used as a substitute for the copper pipe shown on the drawings. Reference: Sections 303.2 and 604.3, IPC 2018.]
01/27/2023 Commercial Structural REQUIRES RESUBMIT 1. The new raster scan drawings are illegible: submit legible drawings,
2. All construction should conform to the 2018 IBC and City of Tucson adopted codes.
12/19/2022 PDSD Application Completeness Express REVIEW COMPLETED