Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06963
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/07/2022 | Site Zoning | APPROVED | |||
12/15/2022 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
12/15/2022 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: T22CM06963 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: DENIED Earlier Review Comments up-dated with this response: 1. Mechanical Drawing M6.1 shows Roof Top Units Schedule with RTU-1 and RTU-2, each weighing 750 pounds. No structural Calculations are provided justifying the existing roof structural members are adequate to support these RTU’s. Submit Structural Calculations justifying the adequacy of the Roof Joists/Roof Girders to transfer the loadings to the Structural Columns. - response states "Sheet S1.0 has been added with roof framing plans and details for support of the new equipment. Calculations are include with this response and are signed and sealed by an engineer licensed in the state of Arizona." These details are not provided, item still OPEN. 2. Provide details if any reinforcing of Steel Joists is needed for the off panel point loadings on the Steel Joists.- not addressed, item OPEN 3. All Calculations shall be sealed and signed by Professional Engineer registered with State of Arizona per Section 107.1 of International Building Code 2018.- Original Calcs stamped and signed by licensed engineer are not included, only the revised calcs addressing existing roof framing under RTU's is provided stamped and signed. item partially OPEN. BUILDING REVIEW COMMENTS: APPROVED MECHANICAL REVIEW COMMENTS: CONDITIONALLY APPROVED Approved/subject to field approval ELECTRICAL REVIEW COMMENTS9 APPROVED PLUMBING REVIEW COMMENTS: APPROVED Second Plumbing Review: OK subject to field inspections 1 - 3 OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
11/07/2022 | Commercial Plumbing | REVIEW COMPLETED | Water | ||
12/07/2022 | Fire New Construction | REVIEW COMPLETED | |||
11/07/2022 | PDSD Application Completeness | REVIEW COMPLETED | |||
11/07/2022 | Site Engineering | REVIEW COMPLETED |