Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06956
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/21/2022 | Commercial Plumbing | APPROVED | RESTAMP REQUIRED | ||
12/09/2022 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM06956 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E2.1A ELECTRICAL POWER RENOVATION PLAN - AREA A: Two sets of office furniture share the same sets of circuits in lower left of sheet. Correct if required. PLUMBING REVIEW COMMENTS: Conditionally Approved -Each Coffee maker water connection on M3.1C Needs its own ASSE 1024 Backflow If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
11/07/2022 | Fire New Construction | APPROVED | |||
11/07/2022 | Site Zoning | APPROVED | |||
12/12/2022 | Site Zoning | APPROVED | RESTAMP | ||
12/09/2022 | Site Engineering | NOT REQUIRED | RESTAMP REQUIRED | ||
12/23/2022 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
11/07/2022 | Commercial Plumbing | REVIEW COMPLETED | Water | ||
12/12/2022 | Fire New Construction | REVIEW COMPLETED | RESTAMP REQUIRED | ||
11/07/2022 | PDSD Application Completeness | REVIEW COMPLETED | |||
11/07/2022 | Site Engineering | REVIEW COMPLETED |