Permit Number: T22CM06798
Parcel: 10309057A

Address:
3801 N RUNWAY DR

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.4

Permit Number - T22CM06798
Review Name: COMMERCIAL REVIEW - FULL v.4
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2023 External Reviewers - SAFEBuilt APPROVED Activity Number: T22CM06798


GENERAL:
Provide written responses to all review comments.
Provide a complete plan set.
Provide additional documents as requested by review staff.


STRUCTURAL REVIEW COMMENTS:
Conditionally Approved
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances.


BUILDING REVIEW COMMENTS:
Conditionally Approved
Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel, or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The registered design professional is responsible for following ALL applicable Federal, State, and local Municipal Codes and Ordinances.


MECHANICAL REVIEW COMMENTS:
Conditionally Approved
Provide ventilation air in an approved manner (MMC2018,403.3.1.1) Complied
Approved/subject to field approval


ELECTRICAL REVIEW COMMENTS
Conditionally Approved
E1.0: Detail #2: Comment only: #8 AWG wire to photocell seems unnecessary.
E4.0: Comment only: Calculated amperage for H1 panel is high for the KVA load. No effect on design


PLUMBING REVIEW COMMENTS:
Conditionally Approved
Third Plumbing Review: OK Subject to Field inspections
1).OK
2). OK Roof to sheet to grade
3). OK
4). OK


If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov
03/17/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/17/2023 Site Engineering REQUIRES RESUBMIT See zoning comment
03/17/2023 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review Section

PROJECT: T22CM06798 – Uhaul
Building Plan Review (3rd Review)
3801 N Runway / I-1

TRANSMITTAL DATE: March 17, 2023

1. COMMENT: Zoning has reviewed the building plans for compliance with the associated Development Package DP22-0219. Zoning cannot approve the building plans until the DP is approved.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
02/18/2023 PDSD Application Completeness Express REVIEW COMPLETED