| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/12/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 05/12/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Denied Reason: Date Completed : 5/11/2023 7:10:15 PM 1. Structural steel, components and fasteners for the roof screen are to be protected against corrosion in accordance with AISC 360 Section B.13 as indicated in IBC 2018 Section 2203.1. 2. Designer is to coordinate venting and drainage hole requirements for HSS tube members that are galvanized using the hot-dip galvanizing process. Provide for plugs as needed. AWS D-19.0 calls for welds on galvanized steel to be free of zinc. Field welds on galvanized parts requires the removal of the zinc coating in the area of weld. Provide zinc paint (approved by the galvanizer) and apply as required to the weld and steel area to provide protection. 1. Provide galvanized bolts on the roof platform framing connections. 2. The requirements in OSHA 1926.757 for the erection of open web steel joists are to be followed. Where steel joists are used with columns that are not framed in at least two directions with solid web structural steel members, a steel joist shall be field-bolted at the column to provide lateral stability to the column during erection. Where constructability does not allow a steel joist to be installed at the column the joists are to be stabilized on both sides of the column. 3. Provide a vertical stabilizer plate at columns for steel joist as required by OSHA 1926.757. Submit a response letter addressing these correction items and provide bubbles on the revisions to the drawings. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved |
||
| 05/03/2023 | Special Inspection Certificate Review (Deferred Submittal) Express | REVIEW COMPLETED |