Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - T22CM06674
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/13/2023 | Site Zoning | APPROVED | |||
10/02/2023 | Water - PDSD | APPROVED | |||
09/13/2023 | Site Engineering | NOT REQUIRED | |||
10/02/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
09/07/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Conditionally Approved Reason: Date Completed : 9/7/2023 1:04:02 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 9/5/2023 3:33:29 PM Mechanical(M) Reviewer Neil Samaan nsamaan@safebuilt.com Conditionally Approved Reason: Date Completed : 9/3/2023 7:10:17 PM Approved/subject to field approval Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 9/7/2023 9:15:16 AM Electrical Review of Banner By: Ron Ross PE E001 ELECTRICAL SYMBOLS & ABBREVIATIONS LEGEND: Missing sheet from set per sheet index. E201 BASEMENT FLOOR POWER PLAN: Missing sheet from set per sheet index. E206 ROOF POWER PLAN: Missing Keynote #2. E303 AREA C LIGHTING PLAN: Missing sheet and missing Comcheck compliance certificate. E801 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Disconnects for new transformers should be on the primary side of the transformers per NEC 450.14. E802 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Disconnect for new transformer should be on the primary side of the transformer per NEC 450.14. E901 SCHEDULES: Several panels do not show an MCB that is shown on the E801 Riser diagram. E902 SCHEDULES: Missing sheet from set per sheet index. Comment on E901 that Panels need to be coordinated with Riser ie Riser shows panels with MCB, panel Schedule should have an MCB also apply. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 9/6/2023 11:15:35 PM First revised plumbing review: 1). Revise detail Sink loop #2 on plan page P601 to correlate with note PL01 on plan pages P301A & P301B- IPC 106.3.1 2). Revise sanitary waste & water riser diagrams on Plan pages P500 & P501 to correlate with clouded changes on plan pages P200B, P301A, P301B -IPC 106.3.1 |
||
09/11/2023 | Fire New Construction | REVIEW COMPLETED | |||
08/31/2023 | PDSD Application Completeness | REVIEW COMPLETED |