Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T22CM06674
Parcel: 123100280

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - T22CM06674
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/13/2023 Site Zoning APPROVED
10/02/2023 Water - PDSD APPROVED
09/13/2023 Site Engineering NOT REQUIRED
10/02/2023 Bldg Permits - Post Review PENDING ASSIGNMENT
09/07/2023 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Daljit Benipal
dbenipal@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 9/7/2023 1:04:02 PM
NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall
not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances



Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 9/5/2023 3:33:29 PM



Mechanical(M) Reviewer
Neil Samaan
nsamaan@safebuilt.com
Conditionally Approved
Reason:
Date Completed : 9/3/2023 7:10:17 PM
Approved/subject to field approval



Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 9/7/2023 9:15:16 AM
Electrical Review of Banner
By: Ron Ross PE
E001 ELECTRICAL SYMBOLS & ABBREVIATIONS LEGEND: Missing sheet from set per sheet index.

E201 BASEMENT FLOOR POWER PLAN: Missing sheet from set per sheet index.

E206 ROOF POWER PLAN: Missing Keynote #2.

E303 AREA C LIGHTING PLAN: Missing sheet and missing Comcheck compliance certificate.

E801 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Disconnects for new transformers should be on the primary side of the transformers per NEC 450.14.

E802 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Disconnect for new transformer should be on the primary side of the transformer per NEC 450.14.

E901 SCHEDULES: Several panels do not show an MCB that is shown on the E801 Riser diagram.

E902 SCHEDULES: Missing sheet from set per sheet index. Comment on E901 that Panels need to be coordinated with Riser ie Riser shows panels with MCB, panel Schedule should have an MCB also apply.




Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 9/6/2023 11:15:35 PM
First revised plumbing review:
1). Revise detail Sink loop #2 on plan page P601 to correlate with note PL01 on plan pages P301A & P301B- IPC 106.3.1

2). Revise sanitary waste & water riser diagrams on Plan pages P500 & P501 to correlate with clouded changes on plan pages P200B, P301A, P301B -IPC 106.3.1
09/11/2023 Fire New Construction REVIEW COMPLETED
08/31/2023 PDSD Application Completeness REVIEW COMPLETED