Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - T22CM06674
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
12/29/2022 | Commercial Plumbing | APPROVED | Restamp Required Water review |
||
12/08/2022 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM06674 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditonally Approved 1. Provide fire damper where duct penetrates roof /ceiling assembly (IMC2018,607.6) sheet M301A Complied 2. Provide fire and smoke dampers where duct penetrates shaft sheet M301B (IMC2018,607.5.5) Compiled 3. Provide CO2 sensors and ventilation or alarm in an approved manner to nitrogen room, also provide sequence of operation for the CO2 system (IBC2018,908.7) sheet M301B Complied Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E202 AREA A ELECTRICAL POWER PLAN: Could not locate Keynote #4. E204 AREA B ELECTRICAL POWER PLAN: Could not locate Keynote #10. E205 AREA C ELECTRICAL POWER PLAN: Suggestion only. Add an extra receptacle on 1 or 2 other walls in Sign Out Rooms to accommodate future furniture changes. Suggestion applies to any rooms with only 1 receptacle on a single wall. E301 AREA A LIGHTING PLAN: Light switch control schedule has last column cut off. E302 AREA B LIGHTING PLAN: Hallways need some exit signs. E402 AREA C SYSTEMS PLAN: Keynote #2 shown, but only call out Keynote #1. E801 DETAILS, SCHEDULES, & RISERS DIAGRAMS: Primary for new 225KVA transformer is undersized and may nuisance trip if it remains a 225KVA transformer. Secondary side equipment could be supported by a 150 KVA transformer per typical NEC calculations. PLUMBING REVIEW COMMENTS: Approved 1). OK 2). OK 3). OK - ** Updated plans state hazard discharge is self contained & doesn't discharge to sanitary see P301A & P601** 4). OK 5). OK 6).OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
12/08/2022 | Site Zoning | APPROVED | Restamp | ||
01/03/2023 | Commercial Plumbing | NOT REQUIRED | Restamp Required | ||
12/12/2022 | Site Engineering | NOT REQUIRED | Restamp Required | ||
01/04/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
12/19/2022 | Fire New Construction | REVIEW COMPLETED | |||
12/29/2022 | Fire New Construction | REVIEW COMPLETED | |||
11/25/2022 | PDSD Application Completeness | REVIEW COMPLETED |